Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
10 minBeamtime support update
  • Covered in Monday's meeting, Chris to take over from Kayla
  • Detector readiness:
    • 2m.1 back at MFX
    • Quads back at MEC
    • New HV module received....return ASC unit to XCS?
    • ReturnePix100#7 for repair?
    • Receive/test ePix100 spares and side-look 1mm ePix10k
    • Baseline JF and 2M 'traveller' pages on Confluence.
      • Collect and analyze any remaining in-lab test data.
30 minPriorities ReviewAll
  • 2021 events:
    • Projects new starts:
      • VFCCD/ePixM downselect → implementation of REXS for 2.2 - April 28
      • SparkPix-S Phase II (full-size ASIC for sparsification, Tixel-based) Has passed PEC
      • ePixHR IV:  Prototype detector
      • TXI Detectors (2Mp and 140kp based on ePixHR @5kHz) CDR Closed out.
      • ePixUHR (130nm TSV structure to reach 100kHz)
    • Production:
      • spare modules (0.5 & 1mm) Module order in work, new sensor order out
      • Proposed 3d copy of ePix10k2m (pending)
      • Proposed spare quads for MEC (2)
      • Proposed in-vac ePix10k2m for CXI
      • Proposed ePix10k4m
      • Proposed UED detector upgrade (2kHz, 125um sensor)
    • RIXS-CCD/cooler test and verification (ship archon and cooler supply to STA)
    • HiZ collaboration tests.
    • Outreach for R&D support (SparkPix-ED, SparkPix Delta).
    • Support effort for LCLS-II-HE instruments (performance verification/implementation planning)
    • SBIR effort for UXI.


  • Group priorities review:
    • Testing
      • Setup ePix10k, ePix100, JF smalls for test in lab
      • Review with TID the stitching progress, look for improvements (meeting 2/10)
      • Can we figure out what's wrong with ePix100/7?
      • RIXS-CCD cooler test/ship plan
    • Analysis
      • Gather and process relevant commissioning data for Mp travellers on Confluence.
          • Solid pedestals
          • Noise map
          • Response uniformity (mini-X cu-fluorescence)
          • Bootstrap gain (sealed source)
          • Linearity (signal injection)
    • Documentation
      • Complete on-line travellers for Mp detectors

    • Development
      • RIXS-CCD, review engineering note with w/NEH 2.2 
      • SXR Downselect prep.  May 1?

    • Lab 'commissioning'
      • DAQ
        • Storage nodes (ordered)
        • LCLS I/II compatibility
      • BIO for racks in chase (Chris to take over hounding)


Actions:


30 minStatus

CH: 

  • Ran Quad 1 at different biases.  Working analysis.
  • Pedestal scripts not working since last last update.  Need Silke's help.  Permissions issue?
  • Need function to pull spectrum (histogram) for each pixel.
  • MPOD messes up above 200V, goes higher than programmed.

RA: 

  • Meet re cooling concepts...met with Jim re outside space: not much.

KP: JSA summary list circulated

  • XPP/MFX/XCS fibers due this week, other wise need ugly solution.
  • Small Rayonix testing can be done by others.
  • XPP/XCS power cable pinout (controls needs to tell us MPOD working)


KN:

  • Spare JF Power supply received.
  • Seb looking for low-intensity diode.
  • UED MPOD?
  • Rayonix pressure issue manifold replaced, refilled, monitoring.


PH:

  • Lent light meter to MEC to test feedthrough.
  • MEC working new cables to improve grounding.
  • Circular connectors tough to release...special tool?
  • EMP shielding for in-vac cables isn't tight at connector...revise?
  • UXI IoC update.


BN:

  • Made updates to detector website, in work.
  • working with PH on porting PyRoot to Python.


KN

  • Sunday MFX finishes, 2M comes off, box delivered to MFX today.
  • XPP having trouble with pgp server hat runs 2M.
  • CXI fiber 450uW becomes 50-60uW, defect in port feedthrough sometime limits to 2uW(?), replacement flanges on order (8-9 weeks).


CH

  • Measurements on sm 10k, pedestal application inconsistent in online ami, raw data is fine.
  • Still see dashed lines in pedestal config.


KP

  • RMA for MPODs
  • Lab cleaning tonight.
5 minBudget Updatemmck
  • M&S Status (Through December)



  • Labor snapshot (December actuals):


15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business

Action items: