30 min | Status | All | - Group priorities review:
- Detectors for Run 18
- Jungfrau commissioning plan and commissioning tests.
- ePix10k2M (new) Commissioning test plan, calibration along same lines as JF.
- ePix10k2M (old) Needs shroud re-replaced, plans for backplate replacement.
- ePix smalls tests to match.
- Detectors under development
- RIXS-CCD, review draft Project Plan w/NEH 2.2
- RIXS-CCD Concept Design (R to set meeting to talk cooling options)
- Anton project at UCB/SSL (milestone/schedule revision received)
- SXR Downselect prep
- Lab 'commissioning'
- DAQ
- Storage nodes
- LCLS I/II compatibility
- Table seismic
- Laser table re-cert
- BIO for racks in chase
- DP node purchase
- Sealed source purchase (M&S evaporating)
Actions:
Other news: CH: USB patch cord available??
- Mask measurements last week.
- Project management training.
- Charge injection scripts on 10k smalls for mask tests.
RA: Beam pipes for 2M? In work. - Loan stages to CXI....ensure return.
- Meet re cooling concepts...met with Jim re outside space: not much.
KP: JSA summary list circulated - Small Rayonix to be tested in XPP...manual available??
- XPP/MFX/XCS fibers due this week, other wise need ugly solution.
- Small Rayonix testing can be done by others.
- XPP/XCS power cable pinout (controls needs to tell us MPOD working)
PH: |