Date

Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minDeployment 2-wk planKPPlans to support upcoming experiments (in-work, Kayla has scheduled meeting for Thursday)
30 minStatusAll
  • Group priorities review:
    • Detectors for Run 18
      • Jungfrau commissioning plan and commissioning tests (Comments on plan? Actions from meeting with Meng to select targets, determine flux))
      • ePix10k2M (new) Final tests before deployment, commissioning test plan commissioning/calibration along same lines as JF.
      • ePix10k2M (old) metrology, done, collect from TID, deploy mid-July.
      • ePix smalls tests to match

    • Detectors under development
      • RIXS-CCD, review draft Project Plan w/NEH 2.2
      • RIXS-CCD Concept Design (meeting with Lin 3pm today to discuss vibe characterization)
      • Anton project at UCB/SSL (milestone/schedule revision received)
      • SXR Downselect prep

    • Lab 'commissioning'
      • Kimball leak test this week (general purpose JSA status?)
      • DAQ
        • Storage nodes
        • LCLS I/II compatibility
      • Table seismic
      • Laser table re-cert
      • BIO for racks in chase
      • DP node purchase


Actions:

    • check with TID about status of small epix100/10ka. (Mark, query sent)
    • check what cables we need for the in-vac epix100 setup in MEC and CXI. (Philip)
    • Leak check Kimball rig, and do vacuum test over several days (Conny/Rebecca)
    • Laser recertification (Kaz)
    • Wave8-V2 tests (Kaz)
    • RIXS system pumpdown and noise vs. temp (Conny/Rebecca)



Other news:

  • Data management meeting (pt. 2) July 2
  • ePix Quads FDR completed, passed.
  • ICD review with NEH 2.2 2:30pm today.
  • Framing Camera whitepaper acknowledged by Kramer, no review yet.
  • ePix10k2M calibration/communication progress continues, no escalation presently necessary.


  • Priorities:
  • JF commissioning tests.
  • ePix10k setup, calibration.
  • RIXS-CCD project plan/concept design
  • Calibrations/procedure developments for detector deployments, starting with ePix.
  • Wave8 readiness.
  • BIO for racks in chase.
  • Seismic table mount components received
5 minBudget Updatemmck
  • M&S Status (Through May)



  • Labor snapshot (May. actuals):


15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business  

Action items

  • ActionKazutaka Nakahara to circulate and/or post chiller manual to confluence.
  • ActionZimmerman, Kayla to provide update on the JSA lab general and eGun approval status.
  • Philip to review old CSPAD data to estimate flux levels for JF commissioning