Date

Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minStatusAll
  • JF4M assembled....servers available? Parts available for assembly beginning 11/22
  • ePix10k Tested at APS. Subsequent tests show solidly operable at 640Hz, not yet giving up on 1kHz.
  • Spoke with David regarding wide body RIXS....concerned that scope of integration is not fully understood/accommodated in planning.
  • Trying to create compelling case for Tixel for September PEC...taking a long time, ongoing.
  • ePix100s forwarded to TID for refurb?
  • Need firmware on 10k small to test....status?
  • SLAC-level Detector Strategy Task Force: SAC presentation went well, SPC this week, then LDAC.
  • DAQ rack plinth set received, fit questionable.
  • Seismic table mount components received..to be installed.
  • LDAC set for Dec. 3-4.
    • Status of 2018 recommendations: 18 closed/complete, 13 in work/on track, 3 deferred/rejected (Doc available).
    • NEED:
      • RIXS-CCD need analysis of flux limitations (status?)
      • 'White paper' on zero-suppression tradeoffs (in work).
      • Data analysis on ePix prototypes tested in Run 17.

Status:

  • RA: Establishing clean area....do not touch items on big table without asking RA first.
  • Need to conclude wiring detail. Each wire should be managed.
  • Set up a meeting with Dan, Raj to talk over packaging, strain relief.
  • Time on drawings....progress ongoing. Four of the big 5 are out....still need 3-d part...looking at making two copies to test machining in house....submit by end of week?
  • PH: Writing RIXS Talk. Submitted two in-house proposals...one on TID sensors, one on UXI@MEC
  • Also one on thin-crystal heating at CXI.
  • Need to discuss acquiring sensors from UXI collaboration.
  • Wiring diagram for Jungfrau (Sameen)
  • Need automated check on pedestal levels...Jason left and no one has picked up.....PH to follow up with Silke.
  • UXI options? Nothing until next year....Liam here this week.
    • Silke to establish a couple of data streams to examine performance on dropped shots etc.
  • EMP testing confusing, un-grounded CSPAD testing this week...test didn't happen.
  • Mike Brown has set up ePix10k and ePix100 on XCS for software development...not done?
  • DAQ can run ePix100, ePix10k, Jungfrau....can't yet save data.
  • Need to check with Chris about data reduction from Run 17.

  • KN:
  • ePix interlock tests done successfully.
  • Need 7 mode PDUs....lupe to make.
  • Getting ready for ePixBig test in-hutch on Wednesday to verify hutch is ready to go in Run 18.
  • Need to get Mike and Dan talking to the JF kit...IoC on top of PSI scripts.
  • Chicane for Marietta almost ready to install eGun.
  • Need to coordinate 4-fiber Wave8 with CDS...single vs multimode.
  • Matt Church helping with Wave8 ?? Need to mount close as possible to flange.
  • All JF Cables are in work
  • ePix10k requires new MPODS, working issue...check again mid November.

  • KZ:
  • RIXS-CCD Procedure draft complete. Review at next detector meeting??
  • RIXS-CCD setup work
  • Toolbox organization/reorder scheme.
5 minBudget Updatemmck
  • M&S Status (initial FY20 not yet posted)

  • Labor snapshot (July actuals):

15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business  

Action items