Toroid Electronics Meeting Minutes

February 14, 2007

Calibration and Toroid Testing

^

Contents

Unknown macro: {maketoc}

^

Attendees:

John Dusatko

Mike Browne

Michael Cecere

Hamid Shoaee

Stephen Norum

 

Agenda:

  1. Calibration Results (ongoing)
  2. Cable Delay Timing
  3. Sequence Timing
  4. SRS to DAC Calibration
  5. MPS Signal Generation
  6. Production Toroid Measurements

Presentation Materials:

PPT for meeting, February 14, 2007, M. Cecere
First Production Toroid Testing.DOC, M. Cecere

Minutes:

  • Circuit Discussion
    • Add "I'm Alive" 24VDC output to MPS active high
    • Increase MPS 24V pull-ups to 3K?
    • Update ICD
    • Test Ext Trig Inputs for data (DAC) update rate
    • Rework 2nd board, record rework instructions, start 3rd board rework
  • Rack Install
    • get two boxes ready, one for Sheng, one for testing
    • When will rack cables be here?
  • Production Toroid Characterization
    • tested 9 toroids
    • 2 of the 3 large bore toroids are shorted internally.
    • others measure good
    • in vacuum/bake out now

Action Items:

  1. M. Cecere: Add MPS "I'm Alive" bit
  2. M. Cecere: External Trigger testing, both Cal and Norm
  3. M. Cecere: Start Second box assembly
  4. M. Cecere: Rework second board and record rework instructions
  5. M. Cecere: When will rack cables be here?
  • No labels