Day Shift

 

8:00am

9:30

10:30am

11:00am

2:00pm

 

No Access

No Access

No Access

No Access

No Access

Beam

Off

Off

Off

Off

On

RF

Available

Triggers

Available

Rate

Available

VVS

Available

[ Schedule

LCLS Commissioning Software Day ]

Item

Start Time

Duration

Comment

Status

Person

Subsystem

Description

 

8:00am

Beam On - invasive

1

 

1hrs

invasive

Access PVs done, Phase Cavity not released

Dayle Kotturi

LLRF

L2 Add ACCESS Pvs Commission Phase Cavity and BSA Test.

2

9:00am

1hrs

invasive

Completed

 

LLRF

Calculations for laser. grab snapshots of calculations for offline analysis.

3

 

1hr

 

Completed

Debbie Rogind, Paul Chu and Jingchen Zhou

Java CA::

Java CA Library Update. Release should fix issues with crash after first timeout in a list of pvs in SCORE,Orbit Display and ChannelWatcher

4

9:30am

30min

 

Completed

Greg White, Joe Frisch and Henrik Loos

Aida/Matlab

New aidaget.m improvement to argument syntax and help.

5

10:00am

1hr

not invasive

Completed, new bug found. Fix not implimeted

Mike Zelazny and Debbie Rogind

Orbit Display

[ Switch Event Definitions (to non 1Hz beam rate, custom Edefs, etc)....

(http:--mccelog.slac.stanford.edu-elog-wbin-elog_item.php?elog_id=259326 ]

6

 

1hr

Invasive to Injector Feedbacks

Completed, no changes left in

Sonya and Stephanie

BPMs

[ BSA dropout test: BPM IOC channel access load test of ioc-in20-bp02

http://mccelog.slac.stanford.edu/elog/wbin/elog_item.php?elog_id=261187 ]

7

 

1hr

 

Completed

Kristi Luchini

Magnets

Add model pvs ECON,EDES,EACT to EPICS controlled magnets. Release Magnet-R3-1-2

8

 

2hrs

 

Completed

Greg White

Model/Aida

Effective length added to Aida.

9

11:00am

2hrs

Invasive to L2 Launch Feedback

[ Completed

http://mccelog.slac.stanford.edu/elog/wbin/elog_item.php?elog_id=262231 ]

Sonya and Till

BPMs

[ Test new merged stripline/cavity BPM software.

http://mccelog.slac.stanford.edu/elog/wbin/elog_item.php?elog_id=260592 ]

10

1:00pm

1hr

invasive

hw problem w/tran module channels not all reading

Magnets

Kristi Luchini

Install Hytec Transition modules in Inj Magnet ioc (ioc-in20-mg01) to filter noise seen on hytec adc's near zero. Remove module after test.

 

2:00pm

Turn Beam On