The following areas all have Ethernet switches. Each switch has port numbers assigned.

  • Injection Area at Sector 20
  • LINAC Sector 21
  • LINAC Sector 22
  • LINAC Sector 23
  • LINAC Sector 24
  • LINAC Sector 25
  • LINAC Sector 26
  • LINAC Sector 27
  • LINAC Sector 28
  • LINAC Sector 29
  • LINAC Sector 30
  • Building 136
  • Building 106
  • Main Control Center (Building 005 - MCC)
  • Building 105
  • Building 406
  • Building 911 (SB2.1)
  • Building 912 (SB2.2)
  • Building 913 (SB2.3)
  • Building 921 (SB3.1)
  • Building 940 (XTOD Front-end Enclosure)
  • Building 950 (XTOD Near-End Hall)
  • Building 960 (XTOD X-Ray Tunnel)
  • Building 999 (XTOD Far-end Hall)
  • No labels