AIP Upgrade Proposal for Magnets |
Date |
Description |
Presenter |
31-Oct-2007 |
Magnet LI22-LI23 QE Linac Upgrade |
Paul Bellomo, Serge Ratkovsky |
06-Dec-2007 |
Magnet LI22-LI23 QE Linac Upgrade |
Paul Bellomo,Serge Ratkovsky |
28-Feb-2008 |
Magnet LI22-LI23 QE Linac Upgrade |
Paul Bellomo, Serge Ratkovsky, K. Luchini |
|
09-Apr-2008 |
Modified QE Upgrade |
P. Bellomo, S. Ratkovskyi, K. Luchini |
30-Apr-2008 |
Magnet LI22-LI23 QE Linac Upgrade |
Paul Bellomo, Serge Ratkovsky, K. Luchini |
08-Sep-2008 |
AIP BSY Magnet Controls Cost Estimate |
K. Luchini |
09-Sep-2008 |
AIP BSY Magnet Controls Cost Estimate |
K. Luchini |
15-Sep-2008 |
AIP BSY Magnet Controls Cost Estimate - Update |
K. Luchini |
16-Sep-2008 |
B136 Corrector PS Upgrade Cost Estimate |
P. Bellomo |
23-Apr-2009 |
Controls Cost for Aprl 2009 Magnet AIPs |
K. Luchini (update) |
28-Apr-2009 |
Linac Dipole Corrector Upgrade 21, 24-30 (Row 19) |
K. Luchini |
08-Apr-2009 AIP |
April 2009 AIP |