Feedback Task List
the following is a list of major projects and sub-tasks of the Fast Feedback subsystem
- Fast Feedback Network
- Requirements and Design Documents and Reviews
- Hardware procurement
- Test Stand Setup
- Software Implementation
- Measurement IOC Middleware
- Requirements and Design Documents and Reviews
- Test Stand Setup
- Software Implementation
- Actuator IOC Middleware
- Requirements and Design Documents and Reviews
- Test Stand Setup
- Software Implementation
- Fast Feedback Network <--> BLD Interface
- Requirements and Design Documents and Reviews
- hardware procurement?
- Test Stand Setup
- Implementation
- Timeslot-aware Actuators
- Requirements and Design Documents and Reviews
- Implementation
- Feedback Controller IOC Application
- Requirements and Design Documents and Reviews
- Test plan and test environment setup
- Interface to Network software
- middle layer/interface to use CA or FF networks
- Launch-type feedbacks
- EPICS Configuration Database
- Machine Status monitoring
- Controller Thread(s)
- Longitudinal feedback
- EPICS Configuration Database
- Machine Status monitoring
- Controller Thread
- Bunch Charge feedback
- EPICS Configuration Database
- Machine Status monitoring
- Controller Thread
- Desktop Runtime Control&Display application
- Requirements and Design Documents and Reviews
- test plan and environment
- control items (start/stop/enable/disable)
- runtime parameters(setpoints,limits, gains)
- runtime performance displays/plots
- restore/reset actuators
- Desktop Configuration Application
- Requirements and Design Documents and Reviews
- GUI
- Configuration Storage
- Configuration framework for similar config items
- special configuration cases
- Create and Edit configs
- Load config to Controller IOC (PVs)
- Reference Orbit collection, edit, store, retrieve
- Feedback Monitor Application
- Design and Review
- implement