Project Reviews
Date | Title | Location |
---|---|---|
2024-03-28 | S30XL Phase A Readiness Review | SLAC |
2020-01-07 | DOE Review of S30XL Phase A | SLAC |
2018-10-05 | SLAC | |
2016-10-05 | DASEL Presentation to DOE Office of High Energy Physics (Confluence) | Germantown, MD |
2016-08-18 | SLAC AD and Science Directorate Review of DASEL Concept and Cost (Sharepoint) | SLAC |
Final Design Reviews
Date | Title | |
---|---|---|
2022-06-14 | S30XL Phase B Mechanical Engineering and Cable Plant, and Phase A MPS System | |
2021-03-16 | S30XL Phase A Controls (excluding MPS) | |
2020-09-10 | S30XL Phase A DCPS and Pulsed Power | |
2020-07-30 | S30XL Phase A Mechanical Engineering Delta FDR | |
2020-05-07 | S30XL Phase A Mechanical Engineering FDR |