Project Reviews

DateTitleLocation
2024-03-28S30XL Phase A Readiness ReviewSLAC
 2020-01-07DOE Review of S30XL Phase A SLAC 
2018-10-05
SLAC Internal Review S30XL (Sector 30 Transfer Line)
SLAC
2016-10-05DASEL Presentation to DOE Office of High Energy Physics (Confluence)Germantown, MD
2016-08-18

SLAC AD and Science Directorate Review of DASEL Concept and Cost (Sharepoint)

DASEL Concept Review (Confluence)

SLAC


Final Design Reviews

DateTitle
2022-06-14S30XL Phase B Mechanical Engineering and Cable Plant, and Phase A MPS System
2021-03-16S30XL Phase A Controls (excluding MPS)
2020-09-10S30XL Phase A DCPS and Pulsed Power
2020-07-30S30XL Phase A Mechanical Engineering Delta FDR
2020-05-07S30XL Phase A Mechanical Engineering FDR