DAQ integration priority order determined together with Sebastien Boutet and hutch scientists
Meeting with sebastien/james/georgi on Nov. 20, 2023
- rixccd (archon)
- mostly complete
- superconducting phase-cavity (close) and ebeam BLD for lcls2
- small txi epixHR (beginning of 2025)
- rix high-rate mono-encoder
- UED 1080Hz epix
- mfx jungfrau16M (a year)
- tmo tixel (running standalone in february?)
- magnetic bottle expts could use existing detector
- would be nice to replace a dream delay-line-detector with tixel? need a larger one. not obligated to users
- higher priority than big txi epixHR
- could replace k-microscope delay-line detector
- rix axis sxr-60 camera (chemrix spectrometer)
- smaller pixel than epix
- can't use andor: flange-mount makes grazing-incidence difficult
- could happen before "the shutdown" (july 2025)
- highest priority for new instrument for rixs experiments
- plan is to implement as an IOC (who? dan? if tid could do it that would be great)
- opal replacement (see Opal Replacement)
- big txi epixHR (big one delayed until aug 2025)
- rix epixM (depends on approved experiments)
- rix k-microscope delay-line-detector (depends on approved experiments)
- should we use the dream dld instead?
- communicate with Bob Schoenlein
- epixUHR (testing and in XPP, production not until late 2026)
- ued andor ixon (the camera used in the old daq? but maybe not)
- maybe an IOC because of long integration times
- might not be too bad if it's an andor
- get more information