Motor Configuration

From Eric on LCLS coordinate systems:

  • X=N-S
    Z=E-W
    Y=vertical
    X+ = north
    Z+ = west
    Y+ = top
  • But, to map this out, you need to change the 'polarity' of the stage and potentially add offsets, which is a pain if we don't keep a good log of these values, so these days, we just don't care what is X or Z. Y is definitely vertical though. I hope we can fix the X/Z part once the cable management project is further along.


Task:  ECS-4030 - Getting issue details... STATUS .


StageIOCPVCablingParameter Manager ConfigStatus

Talbot Y: Micos PLS-85 #1

ioc-mec-usrppl-ims

MEC:USR:MMS:25

HDB 15 to PR60 patch panel

CA-261-805-23-C00


MEC/PLS-85 In-Air

Operational. Check directions. 

Talbot X: Newport UTS100PP

ioc-mec-ppl-xps3MEC:PPL:MMN:24

Direct in-air cabling.

Newport

Operational. Check directions. 

Talbot Z: Newport UTS100PP

ioc-mec-ppl-xps3

MEC:PPL:MMN:23

Direct in-air cabling.


Newport

Operational. Check directions. 

East Lens GHIJ: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[17-19]

Using XPS3 #1-#3 cables, Flange B *1 - *3.

Newport

Operational.

17: -SW +NE

18: -UP +DOWN

19: Check directions.  Eric's advice worked: Kill then Re-init/Home.

To do: 

  • secure vacuum side connections with cable ties

West Lens ABEF: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[20-22]

Using XPS3 #4-#6 cables, Flange B *4 - *6.

Newport

Operational.

20: -S +N

21: -UP +DOWN

22: -W +E

To do: 

  • secure vacuum side connections with cable ties

VISAR Lens: XYZ

ioc-mec-ppl-xps2

MEC:PPL:MMN:[09-11]

XPS2 #1-#3 cables come into bottom SW flange.Newport

Operational.

9: -N +S

10: -UP +DOWN

11: -E +W

JJ Slit: X

ioc-mec-tc1-vt21hv-ims

MEC:TC1:MMS:[17,18]

We are using a mirror reversed pin-out of cable CA-261-802-71-C01 "JJ X-RAY AT-C8-HV SLITS".

Routing is R64B to North side of target chamber via overhead cable trays.

This air-side cable is 2 x DB15S (on JJ Slit side, each DB15S carries offset/gap commands and limit switch readbacks) to 4 x TT19PP).

A new drawing and CAPTAR tags need to created. ECS-3901 - Getting issue details... STATUS

XPP/JJXGap00

XPP/JJXOff00

Running without limit switches. Need to diagnose and correct.  Also ECS-3901 - Getting issue details... STATUS

17: -N +S

18: -OPEN +CLOSE

JJ Slit: Y

ioc-mec-tc1-fwheels-ims

MEC:TC1:MMS:[01,02]

XPP/JJXGap00

XPP/JJXOff00

Running without limit switches. Need to diagnose and correct. Also ECS-3901 - Getting issue details... STATUS

01: -DOWN + UP

02: -OPEN +CLOSE



Detector Configuration

DetectorDAQ HostDAQ ConfigurationCablingStatus
Epix10kaQuad0daq-mec-pgp02-i 0 -P 0x10 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad1daq-mec-pgp02-i 1 -P 0x20 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad2daq-mec-pgp02-i 2 -P 0x11 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Epix10kaQuad3daq-mec-pgp02-i 3 -P 0x21 -R 0 -D 0x1760Unchanged since L-10075.Operational.
Zyla

daq-mec-cam02

daq-mec-cam01

-c 0 -i "MecTargetChamber/0/Zyla/0"USB - fiber optic extender - USB via overhead cable tray dropping into R60.

Operational.

Moved to daq-mec-cam01 due to problems with 10Gb DAQ connection, see ECS-4009 - Getting issue details... STATUS .

Alviumdaq-mec-pgp01-s 04MMC -l 400000000

Direct 8m cable from R62, partially via overhead rack.

Will be in target chamber (air only) for spatial overlap measurement. (one day max). Vincent has cables available.

Operational, and already removed.
Visar1daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.
Visar2daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.Operational.

DAQ/AMI-2 

IssueNotesStatus
XTCAVNeed to test.Not needed for this experiment, defer to Run 22.
AMI-2

Run AMI-2 with:

  • Quads (4)
  • VISARS (2)
  • Zyla (1)
  • Alvium (1)

Peregrine to create test framework, with guidance from Vincent.

ECS-1239 - Getting issue details... STATUS  


  • No labels