You are viewing an old version of this page. View the current version.
Compare with Current
View Page History
« Previous
Version 4
Next »
Introduction
May was filled to the brim with beamtime, and HE is starting to heat up.
PMPS V2.0.0 on the K-line
- PMPS V2.0.0 is now installed on all the K line PLCs , TMO and RIX hutches.
- Same as V1.0.0 on the L line, the eV ranges has been expanded to 32 bits instead of 16.
- The way transmission can be captured has now been changed. It's no longer a percentage. A decimal points are now accepted, with value of 1 indicating full transmission.
- In the Preemptive requests tab, the device names are now displayed along with the hex code request ID.
- And finally, no more milliseconds duration to enter for the bypass duration. Fast fault duration is determined by an "expiration" end date and time.
- You can either select or enter the desired expiration in the calendar widget.
- Press enter. Now you can see the date in the bypass end readback.
- Click on activate. Now you will see the current date and time in the bypass start readback.
Attenuator Seminar
DREAM Design Review
Hutch Python
- The LCLS-II DAQ is now controllable via hutch python. This has been deployed in RIX.
- The RIX hutch python has been outfitted with a mono grating/vernier scanning plan.
FEE Imager Camera Debug Page
We've added a helpful page for debugging FEE Camera issues. Check it out: FEE Imager Camera Debug
RIX Optics
Three mirrors in the RIX hutch took beam for the first time this month: MR2K2: 3 axis Flat mirror, MR3K2 & MR4K2: 5 axis KBO focusing mirrors. MR2K2 was installed on the beam line and taking beam in less than 2 weeks?!