You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Current »

Date

Attendees

Overview

Text in the excerpt box will show up in lists of meetings.Global requirements; some ROD review

Discussion items

ItemWhoNotes
Recap of 7/11 briefing on global requirements

From last time

  • Called by Mike Dunne.Questions like:
    • Why so many SLIMS?
    • Why not identical to Orion DIMs
    • Why such strict pointing stability
ROD Review
Global requirements


-Operational modes

  • Performance requirements
    • Beam at target; experimental conditions
  • Fucntional requirements
    • Relative positions/orientations - grouped by configurations
    • Operational capabilities
    • Protections from known pitfalls
    • High level diagnostic descriptions
Overview of current cavern picture



From last time

Misc.


  • No labels