Priority | MD Item | Procedure Link | Machine Time (shifts) | Responsible Party | Needed By | Notes |
---|---|---|---|---|---|---|
3 | Injector setup for 10deg off Schottky zero crossing | 3 | ||||
3 | Linac Ballistic Data | 5 | ||||
3 | Individual mechanical<>magnetic offsets in L2 | |||||
1 | S20 BBA | 2 | Yocky | |||
2-4 | Notch Collimator recommissioning | 1+2 | Current energy spread may not be compatible with clean cuts | |||
2 | S20 matching studies/emittance in S20 | Sep 8, 2022 | 1 | White | ||
3 | 2nC running/instability investigation | 2 | ||||
TBD | Two-bunch prep/setup | |||||
4 | BLEN sensitivities | Sep 1, 2022 | Alsberg | |||
2 | Investigate orbit dependent matching into L2 | |||||
1 | Complete ORM | Sep 15, 2022 | Loney | |||
2 | Tuning IP with smaller beta* | Yocky | ||||
TBD | Pencil beam config | |||||
3 | Learning data for MDL FF / Track hardware issues | Sep 29, 2022 | Alsberg | |||
4 | RF kicks | |||||
1 | Linac BBA | Sep 8, 2022 | Loney | Need assessment of where we're at | ||
3 | Toroid ringing investigation | Sep 1, 2022 | Alsberg | |||
4 | Injector RF Standby triggering | |||||
2 | Automated Steering development | White/all | ||||
2 | L1 orbit stability study | Parker | ||||
2 | RF stability (jitter, jumps, and djrift) | Sep 15, 2022 | Ripman | |||
2 | DC magnet stability | Parker | ||||
2 | TCAV0 study (sigz v. Sch. phase, etc.) | Parker |