You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

Link to current edition: https://docs.slac.stanford.edu/sites/pub/Publications/ASO-2%20Qualification%20Workbook.pdf

ASO-2 Qualification Workbook.pdf

3.25.20 Workbook Planning Meeting

Draft Workbook

ASO-2 Qualification Workbook.pdf

AGENDA 

  1. List of deprecated items; get approval for removal.
  2. Updates
         *   (Peter's in-progress ASO2 workbook)
         *   Updates from Ops' ASO2 workbook review on 3.2
  3. Longer-term goals
         *   Consistent guidelines for sign-off
         *   Module format
         *   FACET-II Training
         *   LCLS-II Training.

3.24.20 First Pass Rework Meeting

Needs Approval

  • Removed A-line Operating Techniques
  • Removed FACET items:
    • Decode Hardware Status

    • Decode Software Status

    • Decode secondaries

    • Decode CAMAC Status (CSTA)

    • BPMs --> Create measurement definitions, measure tails with single wire scan displays

    • Wire Scanners --> Run wire loop macro

    • Timing --> TRIGs/TRBRs

  • Operating BPMs
    • Calibrate toroids?
    • Check/adjust BPM timing?
    • BSA line items are covered in 2.3
  • Use CMLOG?

Needs Update

  • Timing Section needs update to current system
  • Update 'LCLS Undulator, Dump, and FEE Operating Techniques' section (can we get a training/lecture from physicist?)
  • Spit Linac and LTU sections, resolve BTH/LTU naming mismatch
  • Update 'Profile Monitors' section. Most line items are deprecated.
  • Update 'Using the ACR Hardware and Software Displays and Control' section. Many items ASO1 or FACET or deprecated. 

  • Beam Transport System
    • Add new beamlines (CLTH, HXR/SXR (LTUH/S, UNDH/S, DMPH/S)
    • laser transport optics section rework
  • Add BSY section
    • beam switching (hardware, procedures, PLC junk)
    • 30-BSY
  • Instrumentation and Diagnostics
    • more BPM types
    • photon beam attenuation
    • new photon intensity monitors
    • TCAV and TREX
    • Add new stoppers
  • Update Control System Hardware
  • Update Using Control System to ASO2 level
  • Utilities (rename to Facilities?)
    • Sag/Swell power monitoring
    • PSPS
    • PPS backup battery
  • Make Vacuum system section more trainer-friendly
    • format inconsistent with other sections
    • list specific gauge, pump, etc. types as sub-bullets

 

Things to Remove

2.1 Beam Transport System > Solenoid Magnets > Lenses

4.1 A Line Operating Techniques

 



Things to Add

2.1 Beam Transport System > Beam Transport Lines > CLTH, HXR/SXR (LTUH/S, UNDH/S, DMPH/S)

 

 

Draft of the ASO-2 Workbook below:

  • No labels