Connection Details
Connection details should include:
- Target chamber flange/feedthru
- Controller ID and specific interface, e.g. card, port,...
- Digi/moxa name and port (if used)
- IOC
- From IOC we will determine server and then rack location
- Connection to server, e.g. ethernet, usb3, etc.
Motor Checklist
Purpose | Base PV | Connection | pmgr | python device | Cabled? | Homed? |
---|---|---|---|---|---|---|
West_X | MEC:PPL:MMN:17 | XPS 3/1, T5/*1 | Newport | Yes | Yes | |
West_Y | MEC:PPL:MMN:18 | XPS 3/2, T5/*2 | Newport | Yes | Yes | |
West_Z | MEC:PPL:MMN:19 | XPS 3/3, T5/*3 | Newport | Yes | Yes | |
East_X | MEC:PPL:MMN:20 | XPS 3/4, T5/*4 | Newport | Yes | Yes | |
East_Y | MEC:PPL:MMN:21 | XPS 3/5, T5/*5 | Newport | Yes | Yes | |
East_Z | MEC:PPL:MMN:22 | XPS 3/5, T5/*6 | Newport | Yes | Yes | |
VISAR_X | MEC:PPL:MMN:16 | XPS 2/8, | Newport | |||
VISAR_Y | MEC:PPL:MMN:23 | XPS 3/7, | Newport | |||
VISAR_Z | MEC:PPL:MMN:09 | XPS 2/1, | Newport | |||
Zyla_500mm | MEC:PPL:MMN:08 | XPS NN in-air to beam dump | Newport | |||
TC_hexapod | IOC:MEC:HEX1 | B9 (I think) | Hexapod | Yes | Moved, and re-initialized. | |
Target_X | MEC:USR:MMS:17 | sD2/D5 PM add MForce chassis, digi/moxa, ioc/server | PLS-85 (version?) | Yes | Yes. Homed to HLS and LLS, moved to 0. | |
FXRTS_X | PI XYZ block? | |||||
FXRTS_Y | PI XYZ block? | |||||
FXRTS_Z | PI XYZ block? | |||||
BXRTS_X | Newport | |||||
BXRTS_Y | Newport | |||||
BXRTS_Z | Newport | |||||
Diode_X | Newport | |||||
Diode_Y | Newport | |||||
Beam_block | MEC:TC1:MMS:22 | VT-50-100 (version?) |
Detectors Checklist
Detector | DAQ alias | Connection | Cabled? | In DAQ? |
---|---|---|---|---|
epix10k-540k | quad_0 | |||
epix10k-540k | quad_3 | |||
ePix100 | b_xrts | |||
ePix100 | f_xrts | |||
ePix100 | xpcs | in-air | ||
Andor Zyla | zyla | in-air | ||
VISAR 1 | visar_1 | |||
VISAR_2 | visar_2 | |||
Timing diode | ||||
XRT spectrometer | hxsss | N/A | N/A | |
XTCAV | ztcav | N/A | N/A |