Attendance:


Agenda/Notes:

  • ePixM June 15th Beamtime Prep:
    1. Setup deployment on Wednesday, June 12, 9 am - 12 pm
      1. Confirmed by Matt Hayes
      2. Check detector running in DAQ
      3. Check the fibers connection
    2. Hardware Prep
      1. Fiber convertor and thined unit at ASC now
      2. New power cable ordered by Dawood
    3. Pinhole holder design
      1.     
      2. Need to optimize and prevent light leakage. (Chris Koerber)
    4. Measurement plan



  • Stuff to do:
    1. Look at crosstalk with softHI, look for Y, improve fitting
    2. mini-X tests in marrietta
      1. Status
  • June15th beamtime:   V2 vs V4 modules?  What measurements do we want?
    • softHI and auto:  attenuator scan, but sit at one point for a long time (for more stats).  Zoom in on low flux range.
    • location dependence of effect
    • take data that simulates a potential correction algorithm (black out part of the detector)
    • softHI pinhole re-do:  something odd with the data from day1.  
  • Basic script suite