Attendance:


Agenda/Notes:

  1. ePixM Beamtime preparation:
    1. Request to install in MFX Hutch;
      1. Installed the thick sensor unite at MFX on Tuesday.
      2. The real detector will be installed on Thursday after the meeting.
    2. Fluorescence setup
      1. target holder (Funnel module) and setup --Chris
      2. Target selection (Yttrium, Cu, Ag)
      3. He flight tube (Alex & Matt)
    3. Beam selection
      1. unseeded , Energy ( 11.2kev for Yttrium,  7.8 Kev for Copper)
    4. HIgher reverse voltage to get more depletion. 
    5. Any DAC register optimization
    6. Pre-start meeting on Friday 11:00 am
    7. Measurement Plan (Zongde)
    8. Staffing (05/12/2024, Sunday night Shift)
  2. TID LED pulser setup
  3. ePixM last beamtime data analysis