JIRA Items

LSSTCAM

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Other Items

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

LSST Camera (1.8 FTE)

LSSTCAM charge numbers:16714-B2121, 10139-B2019

Other upcoming tasks/issues coordinated with Nadine Kurita for LSST Camera can be found here Camera Documentation Planning.

Short term projects/deliverables

DeliverableComplete DateResponsibleBlockers/Issues
eTraveler standards, conventions,
best practices documentation. All Camera
subsystems must use
4/27/15Mark/Robert
  • (minus) Consensus from Camera project on core standards
eTraveler procedure for mechanical
assembly of raft electronics boards
(attach coldbars and FPGA heat sink)

Done 5/4

Robert 
eTraveler procedure for raft electronics
board initial testing (bring up board and
load firmware. Prep for functional
TS-REB testing)

Complete 5/23

Robert 
eTraveler procedure for posting RGA
results
Complete TBDMark/Robert

Coordination with Mark Bostic at SLAC for posting RGA
results

Medium/long term projects/deliverables

  Done 4/20
DeliverableComplete DateResponsibleBlockers/Issues
Write demo eTraveler procedures to show Walt Innes
how eTraveler can be used to monitor and control aux
elex inventory
Robert  
With Walt Innes, plan assembly sequence
and eTraveler procedures for ~500
commercial electronic parts

Complete TBD
(Ongoing)

Robert 
Write eTraveler procedures for inventory control
of commercial elx parts
6/15Robert/Mark 
Write eTraveler procedures for testing of elx assemblies as
needed (e.g. Camera protection system)

Complete TBD

Robert 
Consult with SLAC Camera subsystems (Cryo, CBM,
Shutter, I&T) on assembly sequences, scope and "load balancing"
for writing eTraveler procedures
6/15Mark/Robert 
Plan for Camera operations & maintenance
documentation, relationship to eTraveler
7/15Mark/Robert
  • Project decision on how suitable eT is
    for operations and maintenance

Recurring projects/deliverables

DeliverableComplete DateResponsible
3 monthly reportsMonthly 15th, 31stRobert
Camera subsystem FDR, MRR site and document prepRoughly monthlyMark
Camera document control:
doc mgmt, prep, routing, release
(As needed, currently
4-10 hours per week)
Mark

LCLS-II, LCLS (0.1 FTE)

Charge numbers:13877-T2101

Short term projects/deliverables

DeliverableComplete DateResponsibleBlockers/Issues
Finish release of 0266 ICD4/27Mark
  • Matt Boyes back 4/18. He will guide the doc out.
Finish release of Platform ICD4/20Mark
  • Out for approval according to Matt
Finish release of Timing ICD5/4Mark
  • Talk to Matt Weaver and Boyes on some scope still
    floating around
Finish release of HPS FRSs5/11Mark
  • Get blessing from Matt Boyes on outline/contents
Finish release of HPS ESDs5/11Mark
  • Get blessing from Matt Boyes on outline/contents

ePix (0.1 FTE)

Charge numbers:

Medium/long term projects/deliverables

DeliverableComplete DateResponsibleBlockers/issues
ePix100A detector data sheet5/11Mark 
ePix100A installation guide5/11Mark 
ePix100A detector ops/api guide5/11Mark
  • Need to know if assembled detector can/will be
    pre-calibrated (ASIC calibration) and a config database
    delivered

TID-AIR General Work (??? FTE)

Most of these are wish listy items with no time or budget.

Medium/long term projects/deliverables

DeliverableComplete DateResponsibleBlockers/issues
Review permissions scheme for ppareg
Confluence space
 Mark 
Reorg and new navigation scheme for
ppareg Confluence spaec
 Mark 
Run interference with LCLS, LCLS-II doc
control and CDR/PDR/FDR and CD* review
prep.
 Mark 