Motor Configuration
Note (20 October): Ariana will talk with XPP about air-side cables for the Talbot stage
From Eric on LCLS coordinate systems:
- X=N-S
Z=E-W
Y=vertical
X+ = north
Z+ = west
Y+ = top - But, to map this out, you need to change the 'polarity' of the stage and potentially add offsets, which is a pain if we don't keep a good log of these values, so these days, we just don't care what is X or Z. Y is definitely vertical though. I hope we can fix the X/Z part once the cable management project is further along.
Stage | IOC | PV | Cabling | Parameter Manager Config | Status |
---|---|---|---|---|---|
Talbot: Micos PLS-85 #1 | ioc-mec-usrppl-ims | MEC:USR:MMS:24 | To PR60 patch panel Need cable | MEC/PLS-85 In-Air | |
Talbot: Micos PLS-85 #2 | ioc-mec-usrppl-ims | MEC:USR:MMS:25 | To PR60 patch panel Need cable | MEC/PLS-85 In-Air | |
Talbot: Newport TBD | ioc-mec-ppl-xps3 | MEC:PPL:MMN:23 | It is DB15 (not DB25) on stage side. Need cable | Newport | |
East Lens GHIJ: XYZ | ioc-mec-ppl-xps3 | MEC:PPL:MMN:[17-19] | Using XPS3 #1-#3 cables, Flange B *1 - *3. | Newport | Connected and referenced. To do:
|
West Lens ABEF: XYZ | ioc-mec-ppl-xps3 | MEC:PPL:MMN:[20-22] | Using XPS3 #4-#6 cables, Flange B *4 - *6. | Newport | Connected and referenced. To do:
|
VISAR Lens: XYZ | ioc-mec-ppl-xps2 | MEC:PPL:MMN:[09-11] | XPS2 #1-#3 cables come into bottom SW flange. | Newport | Need to check if cables are long enough (lens is mounted on North side). |
Detector Configuration
Detector | DAQ Host | DAQ Configuration | Cabling | Status |
---|---|---|---|---|
Epix10kaQuad0 | daq-mec-pgp02 | -i 0 -P 0x10 -R 0 -D 0x1760 | Unchanged since L-10075. | OK |
Epix10kaQuad1 | daq-mec-pgp02 | -i 1 -P 0x20 -R 0 -D 0x1760 | Unchanged since L-10075. | OK |
Epix10kaQuad2 | daq-mec-pgp02 | -i 2 -P 0x11 -R 0 -D 0x1760 | Unchanged since L-10075. | OK |
Epix10kaQuad3 | daq-mec-pgp02 | -i 3 -P 0x21 -R 0 -D 0x1760 | Unchanged since L-10075. | OK |
Zyla | daq-mec-cam02 | -c 0 -i "MecTargetChamber/0/Zyla/0" | Triggering issues. | Turn Zyla on! |
Alvium | daq-mec-pgp01 | -s 036T9 -l 400000000 | TBD Will be in target chamber (air only) for spatial overlap measurement. (one day max). Vincent has cables available. | |
Visar1 | daq-mec-misc01 | -i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -r | Unchanged since L-10075. | OK |
Visar2 | daq-mec-misc01 | -i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -r | Unchanged since L-10075. | OK |
XTCAV |