Overview
Global requirements; some ROD review
Discussion items
Item | Who | Notes |
---|
Recap of 7/11 briefing on global requirements | | From last time - Called by Mike Dunne.Questions like:
- Why so many SLIMS?
- Why not identical to Orion DIMs
- Why such strict pointing stability
|
ROD Review | | - 033-Spatial chirp: leave space for pre-correction
- 032- Height reduction of compressor - supporting one RR-SP beam (not yet signed off)
- 028- Descopes in project plan for DR
- Going back to a scheme where the RR-SP beam cones in along one line and the OAP sends the beam one way or another
- Making smaller chambers around the mirrors
- F/# from ~4 to 4.5
- Changes to translation of OAP / TFM
|
Global requirements | | -Operational modes - Performance requirements
- Beam at target; experimental conditions
- Fucntional requirements
- Relative positions/orientations - grouped by configurations
- Operational capabilities
- Protections from known pitfalls
- High level diagnostic descriptions
|
Overview of current cavern picture | |
From last time
|
Misc. | | |