Attendees
Goals
- Set and status planning activities for detector development and deployment.
Discussion items
Time | Item | Who | Notes |
---|
10 min | Beamtime support update |
| - CXI ePix10k timing test opportuniy?
- XCS/MFX constants status (PH train Bhavna on processing CI data?)
|
30 min | Priorities Review | All | - 2021 events:
- Projects new starts:
- VFCCD/ePixM downselect → ePixM selected, science leadership has chosen smaller ePixM plus XPCS version.
- SparkPix-S Phase II (full-size ASIC for sparsification, Tixel-based, underway, likely needs LGAD to meet PW spec)
- ePixHR V: Prototype detector project underway, deliver sm camera in time for LDAC results.
- TXI Detectors (2Mp and 140kp based on ePixHR @5kHz) CDR Closed out, project underway.
- ePixUHR (130nm TSV structure to reach 100kHz), planning, need to consider SparkPix-ED results.
- Production:
- spare modules (0.5 & 1mm) Module order in work, new sensor order out
- Approved 3d copy of ePix10k2m: underway, November delivery
- Approved spare quads for MEC: underway, August delivery
- Proposed in-air 2m/1mm, planning in work.
- Proposed UED detector upgrade, planning in work.
- Proposed ePix10k4m (concept)
- RIXS-CCD/cooler test and verification: Delivery delayed until mid-July...readiness??
- HiZ collaboration tests: SSRL LoI needed, Ge chamber tests
- Outreach for R&D support (SparkPix-ED, SparkPix Delta).
- Support effort for LCLS-II-HE instruments (performance verification/implementation planning)
- SBIR effort for UXI.
- Group priorities review:
- Testing
- Run 'standard' cal on two 10k smalls with new firmware, log tracker.
- CompEnOn study during CXI checkout time? 111, 1a vs 19?
- Any ePix100 detectors in ASC? Can we figure out what's wrong with ePix100/7?
- RIXS-CCD cooler test planning.
- Analysis
- Gather and process relevant commissioning data for Mp travellers on Confluence.
- Solid pedestals
- Noise map
- Response uniformity (mini-X cu-fluorescence)
- Bootstrap gain (sealed source)
- Linearity (signal injection)
- Documentation
- Complete on-line travellers for Mp detectors
- Development
- Lab 'commissioning'
- DAQ
- Storage nodes configured, put in use?
- LCLS I/II compatibility?
- Chase racks anchored....cables, water status?
- Vac chamber for in-lab tests? Compatible with XPP alcove?
Actions:
|
30 min | Status |
| Self-assessment period should be open...sequence accelerated this year...go ahead Cal team meet ton Friday?? LDAC Panel assembled Coming up on self-assessment period...aiming for early salary adjustment period
KN: - @MFX for wave8 this week.FIM beamtime this weekend
- Rayonix folks here this week.
- Maciej has provided timing info for new 10ka firmware, needs more test.
- Spare JF Power supply received, need cold plate.
- UED MPOD?
PH: - Started processing CI on CompEn exp....nothing jumps out.
- MEC experiment on Thursday, detectors should be OK
CH: - Will use portable vac chamber for Hi-Z
BN: - Run cal on new ePix firmware.
- Grafana setup to alert Slack channel.
- Made updates to detector website, in work.
- Working with PH on porting PyRoot to Python.
CK: - Run 19 deployment schedule through July.
- Lesker chamber quote in work.
- Materials for chase cable trays.Ge chamber assembly
- Order/borrow Variac.
- XPP having trouble with pgp server that runs 2M.
|
5 min | Budget Update | mmck | - M&S Status (Through March)
![](/download/attachments/311553574/image2021-4-6_8-38-27.png?version=1&modificationDate=1623162565000&api=v2)
- Labor snapshot (December actuals):
![](/download/attachments/311553574/image2021-1-25_14-38-57.png?version=1&modificationDate=1623162565000&api=v2)
|
15 min | Review ASC First Projects | all | Coordinate/update lab schedule. |
10 min | Any other business |
|
|
Action items: