Time | Item | Who | Notes |
---|
10 min | Beamtime support update |
| - Baseline JF and 2M 'traveller' pages on Confluence.
- Collect and analyze any remaining in-lab test data.
|
30 min | Priorities Review | All | - Group priorities review:
- Testing
- Setup ePix10k, ePix100, JF smalls for test in lab
- Characterize: Noise vs. temp, response vs. bias, stitching in transition regions,
charge injection, timing window vs noise, bad pixel maps, constants - UED testing
- RIXS-CCD cooler
- Analysis
- Gather and process relevant commissioning data for Mp travellers on Confluence.
- Solid pedestals
- Noise map
- Response uniformity (mini-X cu-fluorescence)
- Bootstrap gain (sealed source)
- Linearity (signal injection)
- Documentation
- Complete on-line travellers for Mp detectors
- Development
- RIXS-CCD, review draft Project Plan w/NEH 2.2
- RIXS-CCD Concept Design quote in hand ($58k)
- Anton project at UCB/SSL underway, biweekly meetings
- SXR Downselect prep (Peter says 2/1, checking w/TID)
- Lab 'commissioning'
- DAQ
- Storage nodes
- LCLS I/II compatibility
- Table seismic
- BIO for racks in chase
- DP node purchase
Actions:
|
30 min | Status |
| In-person tags in 1050??
CH: - Conference last week, uploaded some talks
- Meeting w/Chris Iniewski, RAL folks.
RA: - Meet re cooling concepts...met with Jim re outside space: not much.
KP: JSA summary list circulated - XPP/MFX/XCS fibers due this week, other wise need ugly solution.
- Small Rayonix testing can be done by others.
- XPP/XCS power cable pinout (controls needs to tell us MPOD working)
KN: - HV cables done, re-install @CXI. Matt found defect in a fiber feedthrough.
- CXI ePix ran fine in ASC over the weekend.
- Grabbing JF modules for test in lab, but need power supply board from PSI.
- IOC
PH: - MEC deployment, can't read back data from one quad.
- Circular connectors tough to release...special tool?
- EMP shielding for in-vac cables isn't tight at connector...revise?
- UXI IoC update.
- w/Bhavna & Frederic regarding commissioning data.
BN: - Got code working, now need to le it run on some data....
- Lab visit week of thanksgiving, January moving.
Thursday uopdates:
PH - UXI
- One quad at MEC had wrong event code, set in expert panel edit traveler for event codes
- Working to understand LV44 data…looks like photons are causing the ‘spikes’ in fourier space
KN - Sunday MFX finishes, 2M comes off, box delivered to MFX today.
- XPP having trouble with pgp server hat runs 2M.
- CXI fiber 450uW becomes 50-60uW, defect in port feedthrough sometime limits to 2uW(?), replacement flanges on order (8-9 weeks).
CH - Measurements on sm 10k, pedestal application inconsistent in online ami, raw data is fine.
- Still see dashed lines in pedestal config.
KP - Bhavna JSA
- BIO for move
- Arranging setup lab
- move mobile rack o XPP alcove
|
5 min | Budget Update | mmck | - M&S Status (Through July)
- Labor snapshot (June actuals):
|
15 min | Review ASC First Projects | all | Coordinate/update lab schedule. |
10 min | Any other business |
|
|