ECS Notes from 27 November 2023:

  • IT, not ECS, takes care of workstation and server power control
  • Controllers
    • Newport controllers (3x)
    • Hexapod controllers (2x)
    • MPOD controller (1x)
  • Servers (manual powercycle)
    • host ioc-mec-evg
    • host ioc-mec-lpl01 
  • confirmed Visar shutter status


And (from Eric Galtier):

From what I saw there just a couple of things we should add to the procedure:

  • turn off the MPOD: add one step to unplug the MPOD from power (the switch is not enough), I have a picture for this. Additionally, we could just switch it off from the PDU once we know which one it is (got a picture of that too)
  • the streak were still on: need to physically turn off the cameras at the body itself (got a picture)
  • I guess final step is turning off the computer but if this is handled by Omar's team then we are all good and we just need to say' hand over hutch to IT' or something like that

Loading