Detector Number | Type | Function | In DAQ? | Notes | Cabled? | Running? | Comments |
---|---|---|---|---|---|---|---|
0 | Alvium | Beam spot | Yes | in-air | Yes | Yes | Beam spot work completed and Alvium returned to XPP. |
1 | ePix10k | QO | Yes | in-vac | See: standard configuration | ||
1 | ePix10k | Q1 | Yes | in-vac | See: standard configuration | ||
2 | ePix10k | Q2 | Yes | in-vac | See: standard configuration | ||
2 | ePix10k | Q3 | Yes | in-vac | See: standard configuration | ||
3 | ePix100a | F-XRTS | Yes | in-vac | standard XRTS, back-facing for forward scattering "We have to see if we want to use the spectrometers so we will update this page accordingly" | ||
4 | ePix100a | B-XRTS | Yes | in-vac | 'old-design' XRTS, front-facing for backward scattering "We have to see if we want to use the spectrometers so we will update this page accordingly" | ||
Not needed, per Eric Galtier.
| |||||||
6 | ePix100a | Small angle scattering | Yes | in-air | Also mounted on 500mm stage. Details? | ||
7 | VISAR1 | Check IOC. ioc-mec-streak-01/02 fail to connect to the streak PCs (win-ics-mec-visar1/2) at startup. I suspect the latter are powered down and need to be checked. | |||||
8 | VISAR2 | Check IOC. ioc-mec-streak-01/02 fail to connect to the streak PCs (win-ics-mec-visar1/2) at startup. I suspect the latter are powered down and need to be checked. |
Overview
Content Tools
1 Comment
Eric M Galtier
For the EMP tests and initial shot on target, we will onluse these detectors:
- ePix10k Q0, Q1, Q2 and Q3
- ePix100a free standing
- VISAR 1 and 2
We have to see if we want to use the spectrometers so we will update this page accordingly. The Zyla is not needed, and the alvium will only be used during the alignment. The VISAR iocs will have to be restarted since it has been a while we have not used them