Detector NumberTypeFunctionIn DAQ?NotesCabled?Running?Comments
0

Alvium

Beam spotYesin-airYes Yes

Beam spot work completed and Alvium returned to XPP.

1ePix10kQOYesin-vac

See: standard configuration 
1ePix10kQ1Yesin-vac

See: standard configuration 
2ePix10kQ2Yesin-vac

See: standard configuration 
2ePix10kQ3Yesin-vac

See: standard configuration 
3ePix100aF-XRTSYesin-vac




standard XRTS, back-facing for forward scattering 

"We have to see if we want to use the spectrometers so we will update this page accordingly"

4


ePix100aB-XRTSYesin-vac

'old-design' XRTS, front-facing for backward scattering

"We have to see if we want to use the spectrometers so we will update this page accordingly"

5ZylaMXIYesin-air

Not needed, per Eric Galtier.

Mounted on500mm stage.

zyla_xray_east

Restart procedure at Zyla and iStar confluence page.

Host is daq-mec-cam02.

6ePix100aSmall angle scatteringYesin-air

Also mounted on 500mm stage. Details?
7VISAR1




Check IOC.    ioc-mec-streak-01/02 fail to connect to the streak PCs (win-ics-mec-visar1/2) at startup. I suspect the latter are powered down and need to be checked.
8VISAR2




Check IOC. ioc-mec-streak-01/02 fail to connect to the streak PCs (win-ics-mec-visar1/2) at startup. I suspect the latter are powered down and need to be checked.





  • No labels

1 Comment

  1. For the EMP tests and initial shot on target, we will onluse these detectors:

     - ePix10k Q0, Q1, Q2 and Q3

     - ePix100a free standing

     - VISAR 1 and 2

    We have to see if we want to use the spectrometers so we will update this page accordingly. The Zyla is not needed, and the alvium will only be used during the alignment. The VISAR iocs will have to be restarted since it has been a while we have not used them (tongue)