You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Agenda: 

  1. Previous Action Items
  2. 2019 Data Reconstruction / Calibration - All
  3. SVT Hit Studies ( part 1 part2 ) - Norman
  4. 2019 Production Reconstruction Studies - Norman
  5. DQM Needs for 2021 Data taking - Matt
  6. AOB

Notes:

Attendees: Norman, Alic, Cameron, Maurik, Nathan, Omar, PF, Tim, Tongtong

Notes:

Action Items:

  • Should we only keep one pulse fit per APVD25 readout?
  • If so, when two pulses are fit, should we discard the lower time fit, or the fit farther from zero?
  • Decide which collections should be dropped from the reconstruction output in order to reduce the file size.
  • Finalize the software in preparation for a pass through 10% of the 2019 data
  • Finalize the steering file to be used on the 10% pass.



  • No labels