Confluence and Jira now require federated login. Read more.
Date
Attendees
Notes
- SSA drain voltages email from Andy?
- Trying to limit the available power on the SSA
- CM33 is set up with lower drain voltage
- Just a SW change - intended to be a short test
- Lowering drain voltages saves both equipment lifetime
- Might interfere with AutoSetup checks in their current configuration
- FW power too low error
- Did in fact happen last night
- Will set the drain voltage back - test is done enough
- CMH1 coupler vacuum interlock tripped
- Alarm limits need to be set up correctly - PVs were green when the vacuum tripped
- Figure out the correct cavities to trip off in this fault condition
- Can probably run until the PAMM, per Yuantao
- Maybe ask for a longer PAMM on the SC machine
- Fast cooldown during the PAMM next week
- SEL phase optimizer didn’t launch from SRFHome last week
- Something odd about which environment it launches from - ran fine running through Matlab using <system> command
- Lisa has a fix that is ready for review
- Nicole at IPAC last week
- Proactive review
- Had a debrief, unclear where the information ended up
- Spares list
- Review what we have, what we need for HE
- Area physicists should cross-check
- Decarad move on the PAMM next week
- Discussion about getting to 4 GeV
{"serverDuration": 64, "requestCorrelationId": "3625d44342a93ada"}