  • SSA drain voltages email from Andy?
    • Trying to limit the available power on the SSA
    • CM33 is set up with lower drain voltage
    • Just a SW change - intended to be a short test
    • Lowering drain voltages saves both equipment lifetime
    • Might interfere with AutoSetup checks in their current configuration
      • FW power too low error
      • Did in fact happen last night
      • Will set the drain voltage back - test is done enough
  • CMH1 coupler vacuum interlock tripped
    • Alarm limits need to be set up correctly - PVs were green when the vacuum tripped
    • Figure out the correct cavities to trip off in this fault condition
    • Can probably run until the PAMM, per Yuantao
      • Maybe ask for a longer PAMM on the SC machine
  • Fast cooldown during the PAMM next week
  • SEL phase optimizer didn’t launch from SRFHome last week
    • Something odd about which environment it launches from - ran fine running through Matlab using <system> command
    • Lisa has a fix that is ready for review
  • Nicole at IPAC last week
  • Proactive review
    • Had a debrief, unclear where the information ended up
  • Spares list
    • Review what we have, what we need for HE
    • Area physicists should cross-check
  • Decarad move on the PAMM next week
  • Discussion about getting to 4 GeV