Webex meeting for those not at SLAC: https://confluence.slac.stanford.edu/display/hpsg/Webex+connection+details

Agenda
  • News/updates
    • Hybrid
    • FE board
    • Flange board
    • RCE platform
  • L4-6 Hybrid testing - Omar
  • Procurement updates
  • LV wire
  • Collaboration meeting
  • AOB

 

Minutes

FE boards are being routed. Ben asked Tung and he expected a first result by end of next week (Jan. 17th).
The order for parts for the FE board had been drawn out by Lupe and Ben. Everything seems to be in stock with expected lead time of 3-4 days. We should order it this week.
We expect to have the first loaded FE board in our hands in 3-4 weeks.

Ben also reported that he is testing the FE board firmware and it looks good so far. 

We should think about if we need temporary adapters in order to test the FE boards. To a minimum we need to power the FE board with an adapter that brings the power onto the board. If we need to readout hybrids before we have the flex cables we need something to replace it. Tim and Ben talked about designing a very simple flex to use for testing. Tim was hoping that flex cables might be on time for when we need to test with hybrids (~5w).

Omar showed the QA results for the new hybrid (which had the T components removed to remove the short). The status of the hybrid look in general good. The noise went down with 25%, Omar should verify based on the older hybrid results. There was a relatively large effect from changing the sampling point on the 

 operate hybrids with the first FE boards. To operate the hybrids withWe need something the small board that takes the power onto the FE board and also something to Expect that we can make a simple power cable to 