You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Attendance:


Presentations:

Agenda/Notes:

  1. ePixM:
    1. Beamtime prep, Status off:
      1. Getting the detector running in DAQ;
      2. Getting the fibers installed at MFX and to server;
      3. Physical setup to secure the camera;
      4. Checking we have the multitosingle mode converter box;
      5. Cables and supplies to run the camera and what bias we need to apply
      6. Light shield to block visible light;
      7. Evaluate the data coming out of the detector;
      8. Testing the data analysis scripts and visulisations;
      9. Testing the timing scan and trigger rate setting script;
      10. Setting up the pre-setup meeting (include TID);
      11. Get the measurement list together;
      12. Schedule the staffing;
      13. Ensure we have the needed support;
  2. A.O.B.
    1. ....
  • No labels