Attendance:

Conny, Philip, Bhavna, Kaz, Alex, Zongde, Xavier, Julian, Nolan, Lorenzo, Bojan, Dionisio, Dawood


Presentations:

Agenda/Notes:

  1.  ePixM:
    1. Beamtime prep, Status off:
      1. Getting the detector running in DAQ;
        1. Done.   Data recorded.
      2. Getting the fibers installed at MFX and to server;
        1. Done. 
        2. Make drawings.  
      3. Physical setup to secure the camera;
        1. Chris Koerber has a solution.  Today at 11am.
      4. Checking we have the multitosingle mode converter box;
        1. Yes, we have it.
      5. Cables and supplies to run the camera and what bias we need to apply
        1. We have all cables and power supplies.
        2. Bias = -50V.  Keep an eye on current draw.  (Installation today)
      6. Light shield to block visible light;
        1. Taped over the yellow kapton.  Test with flashlight today.  
      7. Evaluate the data coming out of the detector;
        1. Data recorded.  No evcode283 yet, but waiting for beam.  Matt Weaver is also checking to make sure it's in the datastream.  
        2. Many hot pixels/columns.  
      8. Testing the data analysis scripts and visualisations;
        1. Negative signal, pedestals ~>20000ADU
        2. 15bits data, 1 bit gain
        3. asic[0] and asic[3] are not bonded.  Only look at asic[1] and [2].  (data is epixm[4][192][384])
        4. ami2 - filter in evcode 283.  
      9. Testing the timing scan and trigger rate setting script;
        1. Timing scan tested....try again in mfx.  
        2. Intensity scan should be ready (same as before).
      10. Setting up the pre-setup meeting (include TID);
        1. Done.
      11. Get the measurement list together;
        1. Beamtime ePixM Measurements Plan Apr 2024.xlsx
      12. Schedule the staffing;
      13. Ensure we have the needed support;
      14. AMI-2
  2. A.O.B.
    1. HV test at TID needs to be done to see what bias we want to run at. 