ATTENDEES:
Sonya, Ernest, Qing, Kukhee, Patrick, Diane, Debbie, Terri, Charley
TOPICS:
Previous Action Items
- Ernest is working on the diagram and final test stand setup - needs more LCLSDEV network ports
- Till implemented a fix for the MAC address problem which Sonya is testing in production now - seems to be working
- Qing will present a BLEN conceptual design review next week.
Multicast Addressing
Till provided slides detailing the choices we have in assigning MC addresses for FCOM and 'private' IOC->EIOC communications. The slides can be found on Sharepoint at
The following decisions were made in our meeting:
- We will reserve 8k contiguous addresses for FCOM
- DNS names for all IOCs and EIOCs on FNET will be <ioc/eioc name>-fnet
- DNS names for master IOC->PAD Multicast groups will be <ioc name>-padg
- Kukhee has a special case: the PACs. The RF Master IOCs will send control commands to PACs only, so it will do this in a different multicast group. the DNS name for master IOC->PAC Multicast groups will be <ioc name>-pacg
- The group agreed on the 'script' method of associating a PAD/PAC with it's master IOC multicast group
- The script will be called in the st.cmd file
- the script will use the DNS name, and the EIOC will use dns look-up for the actual mc group
Requesting Addresses and DNS names
- Charley / Terri / Ken will be managing the addresses
- IOC engineers to fill out DNS name request forms for their subsystems and send to Terri/Charley
- each IOC must have a request for 1) <ioc-name>-fnet, and 2)<ioc-name>-padg (kukhee also needs to request 3) <ioc-name>-pacg )
- each EIOC must have a request for <eioc-name>-fnet
RFHut networking update
Charley has installed a new network switch in the RFHut stack and recabled the RF PADs that were on a private switch to this new switch. The private network is implemented with a VLAN. This is currenly working in production for ioc-in20-rf01 RF IOC, and shows a way that we can install switches and permanently re-cable for FNET during the downtime. When we install fast feedback software in our IOCs, the ports on the new switch must be also configured for FNET. To back out fast feedback software changes, we will also need to re-configure the ports to a private VLAN setup. This switch configuring will be easier than moving cables....
Design Review Scheduling
Qing will do a conceptual design review of the BLEN next week, I'm hoping to get it set up for Wednesday. Partha and Diane will do Final Design reviews in early January.
infrastructure
Ernest points out the Fast Feedback software changes includes a move to RTEMS 4.9.3. This will have to be tested, and coordinated in the fast feedback installation schedule
ACTION ITEMS:
Sonya, Qing, Kukhee - fill out DNS request forms and turn in to Terri/Charley
Terri/Charley - manage addressing, coordinate with Antonio as necessary
Diane - arrange time/location for Qing's BLEN review