You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

Introduction

May was filled to the brim with beamtime, and HE is starting to heat up.

PMPS V2.0.0 on the K-line

  • PMPS V2.0.0 is now installed on all the K line PLCs , TMO and RIX hutches.
  • Same as V1.0.0 on the L line, the eV ranges has been expanded to 32 bits instead of 16.
  • The way transmission can be captured has now been changed. It's no longer a percentage. A decimal points are now accepted, with value of 1 indicating full transmission.
  • In the Preemptive requests tab, the device names are now displayed along with the hex code request ID.
  • And finally, no more milliseconds duration to enter for the bypass duration. Fast fault duration is determined by an "expiration" end date and time. 
    1. You can either select or enter the desired expiration in the calendar widget.
    2. Press enter. Now you can see the date in the bypass end readback.
    3. Click on activate. Now you will see the current date and time in the bypass start readback.


Attenuator Seminar


DREAM Design Review

Hutch Python

  • The LCLS-II DAQ is now controllable via hutch python. This has been deployed in RIX.
  • The RIX hutch python has been outfitted with a mono grating/vernier scanning plan.

FEE Imager Camera Debug Page

We've added a helpful page for debugging FEE Camera issues. Check it out: FEE Imager Camera Debug


  • No labels