You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

Wednesday, Sep-23-2009 Software Day

Program Deputy: Rick Iverson
Physicist Contact: Rick Iverson(day/owl shift)
Controls Deputy: Mike Zelazny
Magnet Controls Contact: Kristi Luchini

References

Day Shift

3:00am

8:00

9:00am

12:00pm

1:00

4:00

Beam Off

Beam Off

Beam Off

Beam Off

Beam Off

Turn Beam On

Magnets Upgrading

LI27

XCOR:LI27:202

XCOR:LI27:302

XCOR:LI27:402

XCOR:LI27:502

XCOR:LI27:602

XCOR:LI27:702

XCOR:LI27:802

XCOR:LI27:900

 

YCOR:LI27:203

YCOR:LI27:303

YCOR:LI27:403

YCOR:LI27:503

YCOR:LI27:603

YCOR:LI27:703

YCOR:LI27:803

YCOR:LI27:900

LI28

XCOR:LI28:202

XCOR:LI28:302

XCOR:LI28:402

XCOR:LI28:502

XCOR:LI28:602

XCOR:LI28:702

XCOR:LI27:802

XCOR:LI28:900

 

YCOR:LI28:203

YCOR:LI28:303

YCOR:LI27:403

YCOR:LI28:503

YCOR:LI28:603

YCOR:LI28:703

YCOR:LI28:803

YCOR:LI28:900

[ Schedule

LCLS Commissioning Software Day ]

Item

Start Time

Duration

Comment

Status

Person

Subsystem

Description

 

 

 

 

9/22 (Tue)

1

9:00am

15min

 

 

K. Luchini

Magnets

Tagged release Magnet-R4-0-4 for IRMIS pickup of db

 

 

 

 

9/23 (Wed)

1

1:00am

1.5hrs

 

 

System

 

IRMIS crawler

2

2:00am

15min

 

 

 

 

Aida Name Server Update

 

3:00am

Beam Off

1

7:00

30min

 

 

A. McCollough

PEM

Install MCOR-to-VME cables and turn SLC Magnet units offline

2

7:30

30hr

 

 

K. Luchini

Magnets

Release Magnet Software (prep) for li27/li28

3

8:00

5hrs

 

 

T.Lahey

Networking

AIP Terminations in LI27/LI28

4

 

15min

 

 

B. Hall

Alarms & ALH

Update alarms with li27/li28 epics names and ALH with new iocs

5

8:30

15min

 

 

E. Grunhaus

Oracle Db

Update Oracle db with li27/li28 magnet changes

7

 

15min

 

 

E. Grunhaus

SCORE

Update SCORE Provider IDs for upgraded magnets

8

9:00

15min

 

 

D. Rogind

SCORE

SCORE Verification, load a config and checkout.

9

 

15min

 

 

G.White

Model

Switch Model data Provider IDs (XAL)

10

9:30

15min

 

 

P. Chu

 

Model Update XAL for LEM/Model

11

 

15min

 

 

H.Loos

Matlab

Update matlab programs with proper epics name for coorector magnets.

12

10:00

45min

 

 

Upgrade Team

 

A complete test of all systems altered for the upgrade.

13

10:45

30min

 

 

Upgrade Team

 

Debriefing MCC Conference Room

14

1:00pm

1hr

 

 

T.Lahey

 

LI27/LI28 Flip cat6 patch panels into final position,unplug all connectins (including magnts) test ports and plug back in.

15

2:00

10min

 

 

K. Luchini

 

Retest magnets in LI27/LI28 after network jobs have been completed.

 

4:00

Turn Beam On - Program Starts

16

4:45

45min

POSTPONED

 

K.Brobeck and I.McGregor

System

Oracle and OS System security patches (reboot aida server mccas0,mccora2)

17

 

45min

POSTPONED

 

Upgrade Team

 

A complete test of all systems altered for System OS and Oracle Upgrade

*Note:*Feedback commissioning will take place during Thursday, 9/24 Machine Development (MD) w/D. Fairley.

Subsystem

Contact

Description

Magnets

K. Luchini

Magnet Software

 

A. McCollough

PEM Install MCOR-to-VME Cables in KA27-0145 and KA28-0145

LCLS Infrastructure Oracle Db

E. Graunhaus

Oracle Infrastructure Db, SCORE

XAL Machine Model Oracle Db

G. White

Updating Aida Directory Service Oracle Db so aida uses XAL for the new names.

SCORE Oracle Db

E. Graunhaus

Modify Catagory Name (ie. Provider ID)

Aida Oracle Db Directory Service

E. Graunhaus

Update Directory Service update used by Aida Name Server

SCORE

D. Rogind

Score testing

Archiver

B. Hall

Add Channel Archiver PVs

Alarms

B. Hall

 

Update Alarm ioc with Magnet corrrector STATSUMY instead of STRG

IRMIS

J. Zhou

IRMIS

Matlab

H.Loos

Update Matlab programs with the proper EPICS names for updated magnets

Model

P. Chu

Update XAL for LEM/Model

  • No labels