30 min | Priorities Review | All | - 2021 events:
- Projects new starts:
- ePixM project plan submitted, n w uploading to P6..
- SparkPix-S Phase II (full-size ASIC for sparsification engine), on-track
- ePixHR V: Prototype detector project underway, deliver sm camera in time for LDAC results.
- TXI Detectors (2Mp and 140kp based on ePixHR @5kHz) delta mech design review on Friday.
- ePixUHR (130nm TSV structure to reach 100kHz), CDR tmrw for 100kHz prototype based on simplified SparkPix-ED.
- Production:
- spare modules (0.5 & 1mm) Module order in work, new sensor order out. No-ghost modules delayed to October.
- Approved 3d copy of ePix10k2m: underway, November delivery (may slip due to module delay)
- Approved spare quads for MEC: underway, August delivery
- Proposed in-air 2m/1mm project plan submitted to OIP.
- Proposed UED detector upgrade, planning in work.
- Proposed ePix10k4m (concept)
- RIXS-CCD/cooler test and verification: Delivery delayed until mid-July...readiness?? Issue with 2nd cooler.
- HiZ collaboration tests: Ge and CZT modules wirebonded, CZT no stick, SSRL & LCLS beam times secured, Ge chamber in work.
- Outreach for R&D support (SparkPix-ED, SparkPix Delta).
- Support effort for LCLS-II-HE instruments (performance verification/implementation planning)
- SBIR effort for UXI.
- Group priorities review:
- Testing
- Run 'standard' cal on two 10k smalls with new firmware, log tracker.
- CompEnOn study during CXI checkout time? 111, 1a vs 19?
- Any ePix100 detectors in ASC? Can we figure out what's wrong with ePix100/7?
- RIXS-CCD cooler test planning.
- Analysis
- Gather and process relevant commissioning data for Mp travellers on Confluence.
- Solid pedestals
- Noise map
- Response uniformity (mini-X cu-fluorescence)
- Bootstrap gain (sealed source)
- Linearity (signal injection)
- Documentation
- Complete on-line travellers for Mp detectors
- Development
- Lab 'commissioning'
- DAQ
- Storage nodes configured, put in use?
- LCLS I/II compatibility?
- Chase racks anchored....cables, water status?
- Vac chamber for in-lab tests? Compatible with XPP alcove?
Actions:
|
30 min | Status |
| Self-assessment period should be open...sequence accelerated this year...go ahead Cal team meet ton Friday?? LDAC Panel assembled Coming up on self-assessment period...aiming for early salary adjustment period
KN: - Rayonix needs repair at Rayonix, do in August
- XPP needs 4 ePix100 by July 1 plus 0.5m JF
- LCLS-II DAQ not fully operational in ASC....needs resolution
- @MFX for wave8 this week.FIM beamtime this weekend
- Spare JF Power supply received, need cold plate.
- UED MPOD?
PH: - Started processing CI on CompEn exp....nothing jumps out.
- MEC experiment on Thursday, detectors should be OK
CH: - Small 10k still has fw problem
- Measuring leakage via ACQ timing window
- Will use portable vac chamber for Hi-Z
RA: - Prepare for mid-july RIXS-CCD
- Lost Derek, may need May Ling to help training on laser vibrometer
- Need mtg for acceptance test planning (Friday)
BN: - Min/max stitching.
- Run cal on new ePix firmware.
- Grafana setup to alert Slack channel.
- Made updates to detector website, in work.
- Working with PH on porting PyRoot to Python.
CK: - Lesker chamber quote in work.
- Order/borrow Variac.
|