You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Agenda for SEECS/SLAC meeting February 2nd, 2011.

Bold face, topics for coming meeting that we need to address

Future

  • Les has his Pakistan visa and airline tickets. There are problems getting authorization from DoE.
  • The draft letters of invitation for Sadia and Amber are with SLAC's international services.
  • Sadia, Amber and Bilal have their SLAC computer and Wiki accounts
  • Zafar received his DS-2019 on Dec 10 (Fri). Applied for visa on Dec 13 (Mon). Interview date was Jan 3, it has been delayed to 24 Jan.

Pakistani case study - Zafar, Anjum

  • Nodes wise details
  • Amber is working on the Pakistani Case study.
    • A summary of the case study is in the ICFA report.
  • UETTaxila Zafar
    • Zafar has started taking and archiving traceroutes between Pakistani monitoring hosts on a daily bases.
    • Amber has analyzed, apart from high congestion it is hard to get patterns of use.
  • Amber will need to get up to speed on Linux.
  • Look at NUST trends over last year, which sites have improved
  • Sadia is looking at adding MOS and alpha into pingtable.

ICFA Report

  • The ICFA report has been submitted - Zafar
  • Zafar is working on a case study for Egypt.

PingER

  • The traceroute server and ping_data.pl have been installed and working in Sarawak.
    • The traceroute/ping server needs to be added to TULIP.
  • We are working on getting pinger2.pl working. The pinger.xml page needs to be fixed
  • PingER archive site: Ghulam and Farhan couldn't discuss database architecture with Umar Kalim. They have however created two ERDs. One is a simple design (relatively inefficient) and another is a complex design (relatively efficient though it might introduce some redundancy). They have created MySQL databases following both ERDs and will start work on stress testing it as soon as they are free from exams. Zafar has discussed stress testing with them already and they have a fair idea of what to do.
Visualization pinger map - Faisal
  1. Colors for connected links
  2. Range and Colors configuration
  3. Layout revamp to provide more space for map

TULIP

  • With the move to the new host Faisal had to get a new cookie to allow scriptroute to run scripts on the PlanetLab infrastructure. Still needs testing.
  • Get the MatLab license at SEECS and put up a CGB server using it. Do not have license for MatLab will do on own machines to test and will migrate when have license. Zafar will contact Arshad and Ali. Basically the client will call the reflector with the target. The reflector will return the landmarks and RTTs. The client will then call the CBG/MatLab server with the relevant RTTs, lat/longs etc. Progress
  • Bilal has read the TULIP architecture. He has a moderate understanding of how it works. He is modifying CBG code. Now it is ready for integration with TULIP. I sent the reflector/eventhandler, tulip-viz.cgi, & Faisal sent the Java code to Zafar. A student was given a task. Zafar needs to answer where we are, and the progress. Adnan will get back to us ibn a day or so to tell progress. There will be exams in the coming week, so progress may be stalled for a while. May be an issue with the MatLab

PerfSONAR

Problems were fixed. NTP servers were causing considerable clock delay. Added close-by Stratum 1 NTP servers to solve the problem. Nodes were updated to PerfSONAR version 3.2 (Fedora distro). Nodes however are offline since they were disrupting normal traffic. We are waiting for 10 Mbps dedicated connection to switch the nodes back on. - Update

  1. Faisal is working with Yee.
    1. Working with Yee to get Lat long of perfSONAR host corrected.
  2. Zafar - deploy PerfSONAR nodes at SEECS. Second step is to find whether the same can be done at HEC on PERN's network. It is working, congratulations!

Possible projects

See [https://confluence.slac.stanford.edu/display/IEPM/Future+Projects]. Zafar will talk to the students about these projects.

  1. Extend the NODEDETAILS data base to allow entry support for whether the host is currenty pingable. 
  2. Extend Checkdata to provide emails automatically, see [https://confluence.slac.stanford.edu/display/IEPM/Extend+checkdata+to+make+it+more+useful]. Many of the ideas in the script node-contacts.pl are a step in this direction.

  3. Add MOS and alpha to pingtable.pl see [https://confluence.slac.stanford.edu/display/IEPM/Add+Mean+Opinion+Score+%28MOS%29+to+pingtable.pl+metrics]  Sadia will start work on it when done with HEC report,  writing thesis. Sadia and Zafar are looking at this. It requires cahnges to pingtable.pl and analyzs*.pl scripts.

  4. Improve the PingER2 installation procedures to make it more robust. This might be something for the person(s) in Pakistan who are responsible for installing PingER2 at the Pakistani monitoring sites. They probably have found where the failures occurs. Also look at the FAQ, and ping_data.pl which has been improved to assist in debugging, could it be further improved (e.g. provide access to the httpd.conf file so one can see if it properly configured)? There are 2 students working on the PingER archive. *Is this something they could work on?*
  5. Fix PingER archiving/analysis package to be IPv6 conformant|display/IEPM/Make+PingER+IPV6+compliant||\. Will build a proposal for an IPv6 testbed. They will try various transition techniques. A proposal has been prepared and that has been submitted to PTA. Adnan is a co PI. It is being evaluated today.  A small testbed has been established in SEECS and the plan to shift some of the network to IPv6. Bilal is part of 3 students involved with PingER and they will be involved with IPv6. They are porting the PingER archive site site to using a database. They have redeveloped the archive site using Umar's documentation. They have set up a small test archive site. They have gathering, archiving, analysis. They will design a new database. They will also try a port of PingER to IPv6. 
  6. Look at RRD event detection based on thresholds and how to extend, maybe adding plateau algorithm. Umar's algorithm did  not work in a predictable manner.

Paper - Umar, Fida, Zafar

  1. SVN for paper, Umar has set it up and it is working. Umar will send out the accounts. Not critical at the moment.
  2. Umar will take as the main/first author of the paper. Ali Khayam has put together an introduction
    identifying the main points. Umar will send in the first draft and put together with feedback from Ali. Umar hopes to be done by Mid December. Umar is currently overwhelmed. Zero progress 11/10/2011. Umar has to submit a camera ready copy in the next couple of days.
  3. Adnan is also interested in working on the paper and will talk to Umar.
  4. Umar sent draft to Adnan. Umar will be in Pakistan later this month and will get together with Adnan. Fida will be available after December 16th.
  5. Fida will send review comment to Adnan
  6. Meeting between Adnan, Umar, Ali Khayam did not come to pass due to Adnan being sick. It is believed we need a re-write, the technical details are OK. Adnan will get to more rigorously.

AOB

Future meeting time - Les

The next meeting in Wednesday 26th January 2011 for people in US and 27th January for people in Pakistan.

  • No labels