Geometry

Status:

  • The tile and ribbon dimensions were obtained from the ACD engineers last summer. Joanne updated all dimensions to account for shrinkage at operating temperature.
  • Overlap of top tiles
    Updated to go in the correct direction (thanks Joanne). Consequence was that the modeling of the ribbons on the top was modified causing the need to update some code in AcdRecon and AcdUtil.
  • Curvature of the top tiles has been implemented in a more recent tag of xmlGeoDbs (thanks Joanne)
    This needs to be tested and the digitization and active distance calculations updated to accomodate the new volumes in the geometry.

To Do:

  • Cross check the placement of the tiles and ribbons against the integration testing position maps.
    When will data be available?
  • Update Blanket/MMS
    Dave Thompson has provided the final numbers
    Currently the blanket/MMS is simulated as a single layer of cooked up material. Do we desire a more accurate representation? The cost being multiple layers to propagate through in the simulation.
  • Screws
    Typical tiles have four iron screws each, the bottom row large tiles have 20 (I think). Much work went into this before DC2. However, there were problems in how the volumes associated with the screws were handled by the simulation. Joanne has volunteered to address this again and basically start from scratch.
  • Shingling
    Work on this has not been scheduled.
  • No plans for modeling flexures, BEA, or updating the simulation of the support material.

Digitization

Status

To Do:

  • Ribbon Attenuation
  • Fiber attenuation

Reconstruction

h2 Status

To Do:

  • Removal of old DOCA and original Active Distance calculations and their ntuple entries.

System Tests

Status

To Do:

  • No labels