Introduction
There are three periods of test beams in which 3D sensors will be tested at CERN. This page contains a placeholder for notes/reminders for preparation.
MCC board
- General tests (Pelle & Alessandro)
BAT
- List of tests to be carried out before using (Pelle & Alessandro)
10-17 October
DUT's
- List of devices under test
- STA-3D (2E,3E and 4E?)
- CNM
- SINTEF
- FBK (irradiated?)
EUDET Telescope
- Hardware modifications on TPLL
- TPLL boards from Oslo and Manchester are modified
- If we use the MCC board only one (with some backup perhaps) needs to be modified
- Software changes
- Minor modification for the Oslo reconstruction code (Ole)
- Need to modify the BAT online monitoring if we use the MCC board.
- Mount for devices
- How many devices can fit in the telescope
Run plan
Should focus on measurements that require the extra resolutions
- Charge sharing
- Electrode charge collection efficiency
24-04 November
This assumes that we have access to the Morpurgo magnet.
DUT's
- List of devices under test
- STA-3D (2E,3E and 4E?)
- CNM
- SINTEF
- FBK (irradiated?)
- Mounting
- Prefered choice: Use the cooling box from May even if there is no required cooling
- If irradiated sensors are used then we need to verify the cooling in the box (Anyone?)
- The May cooling box could hold only 4 DUTs, using MCC it is easy feasable to test at least 8
- Need new box/mounting
Run plan
Should focus on the measurements to validate the 3D performance and fill in the information we are lacking from the May TB.
- Angle scan
- Magnetic field strength scan
20-25 November
This period is in H6 without magnetic field.
DUT's
- List of devices under test
- STA-3D (2E,3E and 4E?)
- CNM
- SINTEF
- FBK (irradiated?)
- Mounting
- Same comments as above.
- Irradiated sensors should be available, see earlier comments on mounting