This is the home page for all LCLS-II-HE Phase Reference Line activity.
Action Item | Assignee | Timeline | Status |
---|---|---|---|
Update HMC1119 Variable Attenuator PCB | Thi | 2023 | COMPLETE |
Build MO-LO Power Supply Chassis with +8V/+18V switching supplies. | Thi | April-May | PENDING |
Action Item | Assignee | Timeline | Status |
---|---|---|---|
Review all drawings. | Bo/Thi | ||
Action Item | Assignee | Timeline | Status |
---|---|---|---|
Follow-up with Nate on procurement timeline. | Bo | ||
Action Item | Assignee | Timeline | Status |
---|---|---|---|
Set up long-term test environment for HMC1119 Variable Attenuator testing. | Thi | April | WIP |