KES
First iteration, beam only
Step 1: find beginning of the beam. Script: GAMMA1 (blue) and E320_TARGET (yellow); both total counts as a function of YAG_VERT position
Step 2: full horizontal scan. Script
Step 3: full vertical scan.
Second iteration: after laser was walked to the beam
Step 1: MO_MAG (yellow) + GAMMA1 (blue)