MD Priorities List
Priority | MD Item | Procedure Link | Machine Time (shifts) | Responsible Party | Needed By | Prerequisites | Notes | Complete |
---|---|---|---|---|---|---|---|---|
3 | Injector setup for 10deg off Schottky zero crossing | 3 | White | TCAV0 operational | Maybe investigate smaller laser spot | |||
3 | Laser spot size variation | Discussion with Glen | ||||||
3 | Linac Ballistic Data | 5 | ||||||
3 | S20 Ballistic Data | Good pencil beam config | ||||||
3 | Individual mechanical<>magnetic offsets in L2 | Loney | ||||||
1 | S20 BBA | Oct 13, 2022 | 2 | Yocky | x | |||
2-4 | Notch Collimator recommissioning | 1+2 | Current energy spread may not be compatible with clean cuts | |||||
2 | S20 matching studies/emittance in S20 | Sep 29, 2022 | 1 | White | Good pencil beam config, S20 Quad BBA, S20 launch feedback | x | ||
3 | 2nC running/instability investigation | 2 | Loney | FJD interested | x | |||
TBD | Two-bunch prep/setup | Yocky* | ||||||
4 | BLEN sensitivities | BLEN Sensitivities MD | Alsberg | |||||
2 | Investigate orbit dependent matching into L2 | White* | BBA, working steering app | FJD notes similar issue in LCLS–likely eta from BC1 | ||||
1 | Complete ORM | Loney | ||||||
2 | Tuning IP with smaller beta* | Yocky | ||||||
1 | Pencil beam config | Oct 13, 2022 | Alsberg | x | ||||
3 | Learning data for MDL FF / Track hardware issues | Oct 6, 2022 | Alsberg | |||||
4 | RF kicks | Alsberg | ||||||
1 | Linac BBA | BBA Shift Plan | Loney | x | ||||
3 | Toroid ringing investigation | Sep 1, 2022 | Alsberg | |||||
4 | Injector RF Standby triggering | Loney | ||||||
2 | Automated Steering development | White/all | good R measurements and ability to implement those into steering app | |||||
2 | L1 orbit stability study | Oct 6, 2022 | Parker | |||||
2 | RF stability (jitter, jumps, and djrift) | Sep 15, 2022 | Ripman | |||||
2 | DC magnet stability | Sep 29, 2022 | Parker | x | ||||
2 | TCAV0 study (sigz v. Sch. phase, etc.) | Oct 6, 2022 TCAV0 Shift Plan | Parker | |||||
1 | Linac wakefield bump tuning exploration | Yocky | ||||||
1 | Commissioning Laser Heater | Yocky* | Laser Heater Commissioning Task List | |||||
3 | 7-hole Cathode Alignment Procedure | <1 | Loney |