Motor Configuration

Note (20 October): Ariana will talk with XPP about air-side cables to the Talbot stage


From Eric on LCLS coordinate systems:

  • X=N-S
    Z=E-W
    Y=vertical
    X+ = north
    Z+ = west
    Y+ = top
  • But, to map this out, you need to change the 'polarity' of the stage and potentially add offsets, which is a pain if we don't keep a good log of these values, so these days, we just don't care what is X or Z. Y is definitely vertical though. I hope we can fix the X/Z part once the cable management project is further along.


StageIOCPVCablingParameter Manager ConfigStatus

Talbot: Micos PLS-85 #1

ioc-mec-usrppl-ims

MEC:USR:MMS:24

To PR60 patch panel

Need cable

MEC/PLS-85 In-Air


Talbot: Micos PLS-85 #2

ioc-mec-usrppl-ims

MEC:USR:MMS:25

To PR60 patch panel

Need cable

MEC/PLS-85 In-Air


Talbot: Newport TBD

ioc-mec-ppl-xps3

MEC:PPL:MMN:23

Using XPS2 #8 cable (on beampipe) to XPS3 #7. 

Nope - need to remove. It is DB15 (not DB25) on stage side.

Newport


East Lens GHIJ: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[17-19]

Using XPS3 #1-#3 cables, Flange B *1 - *3.

Newport

Connected and referenced.

To do: 

  • motion verification
  • secure vacuum side connections with cable ties

West Lens ABEF: XYZ

ioc-mec-ppl-xps3

MEC:PPL:MMN:[20-22]

Using XPS3 #4-#6 cables, Flange B *4 - *6.

Newport

Connected and referenced.

To do: 

  • motion verification
  • secure vacuum side connections with cable ties

VISAR Lens: XYZ

ioc-mec-ppl-xps2

MEC:PPL:MMN:[09-11]

XPS2 #1-#3 cables come into bottom SW flange.Newport

Need to check if cables are long enough (lens is mounted on North side).



Detector Configuration

DetectorDAQ HostDAQ ConfigurationCablingStatus
Epix10kaQuad0daq-mec-pgp02-i 0 -P 0x10 -R 0 -D 0x1760Unchanged since L-10075.OK
Epix10kaQuad1daq-mec-pgp02-i 1 -P 0x20 -R 0 -D 0x1760Unchanged since L-10075.OK
Epix10kaQuad2daq-mec-pgp02-i 2 -P 0x11 -R 0 -D 0x1760Unchanged since L-10075.OK
Epix10kaQuad3daq-mec-pgp02-i 3 -P 0x21 -R 0 -D 0x1760Unchanged since L-10075.OK
Zyladaq-mec-cam02-c 0 -i "MecTargetChamber/0/Zyla/0"Triggering issues.Turn Zyla on!
Alviumdaq-mec-pgp01-s 036T9 -l 400000000

TBD 

Will be in target chamber (air only) for spatial overlap measurement. (one day max). Vincent has cables available.


Visar1daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:01 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.OK
Visar2daq-mec-misc01-i MecTargetChamber/0/StreakC7700/1 -b MEC:STREAK:02 -B IMAGE1 -n 64 -z 2818048 -f 1 -rUnchanged since L-10075.OK
XTCAV



DAQ/AMI-2 