Excel spreadsheet for the FEL settings is here.

  • Prepare the hutch for the shift (done 1h before the actual start time)
    • open the grafana dashboards located here (requires UNIX login/pwd) to access beam owner, energies and coatings
    • no gate valve in the trajectory
      • check in the vacuum windows that no gate valves from the NEH to the MEC hutch are IN (red)
      • it is ok that the DG2 STP 1 is IN
      • it is ok that the GL window is IN in MEC
    • open the rolling status and confirm that no devices upstream the hutch obstructs the beam

      op.rs()
    • insert yag3 to provide a photon terminator before TCC prior to send any beam in the hutch

      op.yag3.insert()
    • confirm that the chamber is loaded with targets and being pumped down to be ready at the start of the shift
    • search the hutch but leave SH6 IN (you are not the beam owner yet)
  • 15 min before the shift begins, call ACR at x2151 to check
    • look at current ACR beam operator on shift here
    • confirm photon energy
    • confirm pulse energy
    • confirm pulse duration
    • confirm beam mode
    • confirm multiplexing mode
    • ask for an e-loss scan
  •  getting ready to accept the beam:
    • close DG2 STP 1
    • make sure the reference laser is out (check in the rolling status)
    • confirm the target chamber is pumped down
    • insert the Be window IN the beamline
    • search H6 if not already searched
    • remove SH6 OUT of the beamline
  • beamline alignment
    • check 'MR1L3' mirror OUT (-6000) position (after XCS)
    • insert YAG0 ([1] op.yag0.insert())
    • confirm FEL beam is on scale "0"
    • confirm the shape of the beam is round
    • insert YAG1 ([1] op.yag1.insert())
    • insert MR1L4 : check coating for photon energy
    • confirm on yag0 that the beam is properly deflected on the scale "8 cm"
    • remove YAG0
    • remove all Si attenuators ([1] op.SiT(1))
    • open the pulse picker ([1] op.pulse_picker("open"))
    • fine tune the pitch of MR1L4 to center the beam on YAG1
    • insert YAG3 ([1] op.yag3.insert())
    • remove YAG1
    • fine tune the pitch of MR1L4 to center the beam on YAG3
  • once they are done tunning