Attendees: Rebecca, Eliazar, Elena, Armin, Marc, Vincent
- Documents:
- Controls ESD - new language from Alex - Vincent to check
"The MFX 6DOF Sample Table shall be controlled and integrated with appropriate interlocks."
"The MFX Detector Mover shall be controlled and integrated with appropriate interlocks."
- Vincent/ALex/Matt/Maggie update doc?
- Maggie is following up
- Vincent/Antonio/Rebecca - working on estimate for added scope. waiting for vendor (Cosilab) quote (maybe we will have this week)
- Controls IRD in progress - maybe look at next time
- Vac analysis R1 released - check naming convention
- MFX + XPP mega schematic
- Stand naming walkthrough
- Laser PRD - revisit with new laser resources
- Alan Mihanari
- Patrick Kramer
- ICD-Lasers - access on working site: https://slac.sharepoint.com/:w:/r/sites/lcls/lcls-2-he/wd/ICD/LCLS-II%20HE%20MFX%20Lasers%20ICD.docx?d=w73e52e9056f94e0cb9df481c8cd63f6d&csf=1&web=1&e=hJLtqF
- Rebecca
- ICD - controls - complete
- RDS- R1
- drawings added
- Equipment anchoring BIO review - in process (Elena)
- stands - complete
- stopper
- Controls ESD - new language from Alex - Vincent to check
- Controls Coordination - meet up to discuss status
- Enclosure Box selected - 6Uish from Rittal
- Controls subassemblies almost ready - starting to add enclosures along beamline
- transfocator controls - model and find space
- Stand profiles - XRT, Hutch
- Maggie and Vincent are POCs - maggie is out for a few weeks.
- Rack Plan - next week
- Hardware is in mechanical scope- controllers in controls scope
- out of scope items - older vac equipment, cameras, and motors etc. : how is this tracked?
- all new items will be addressed by this project
- maintenance items should be addressed by operations program
- Endstation scope add estimate: eplan dwg (cosilab) and estimate spreadsheet TBD
- Water Routing
- regroup with F&O in January
- add hardware to model
- Detector Coord
- Meeting on Friday - Jana will attend to discuss documentation
- Walk through with Jana in FEH to look at space for CO2 chillers in Mezzanine (thurs)
- Laser coordination
- Engineer: Alan Mihanari, Scientist: Patrick Kramer
- ICD/PRD/Laser ESD still in progress
- transport line is now under raised floor — please verify height is correct.
- stay-clears for in-between laser table and diagnostic stand - interface is tricky
- LSS safety system shutters are there
- controls need access- access from raised floor side?
- stay-clears for in-between laser table and diagnostic stand - interface is tricky
- Ongoing requirements negotiations/meetings
- liquid phase chemistry stuff wasn't really captured → meeting on Monday with Tim VD/Roberto?
- review of historical laser parameter requests
- Tim was invited to last mtg. and explained his requirements
- NO NEED FOR CHANGES. Written Agreement pending. (CC DF)
- we are also ready to design laser out-coupling when laser team has details/requirements available
- Does the detector situation matter? beam tube size? this geometry is important...
- ideal hole diameter?
- what is needed?
- what is common ?
- document on confluence and eventually in PRD
- Resend Z location info to M. Greenberg - help him figure out divergence etc. which will let us know what hole diameter we need...
- thermal issues (see below)
- Radiation safety
- photon dump design kicks off this month
- ESD in progress with mechanics specified
- need a controls engineer (to complete prelim design of electronics and complete ESD)
- ray trace
- data input complete
- walk through with RP during next meeting(s)
- KB
- chiller check - rack space - under diag1
- check perimeter (for enclosure) - in model
- Status?
- IE
- photon dump design kicks off this month