TopicsNotes
ROD-013 - Ready for Approval?

Send for signatures.

Data Requirements (IFE)Jana unable to attend, postpone until next time.  Uncertain from a data standpoint (Gilliss).  Box 6, 7, 8 (below) are not advertised as part of the project and will need to understand requirements.  What's difficult to retrofit in at a later date?  Automated 'volley' of shots without user intervention.  Interfaces required?  At what point is definition required?  Where does parameter scan come from?  Do we have the right suite of diagnostics with interfaces to DAQ?  Latency in data storage, analysis and handling that may preclude changing configurations on a rapid basis?  LLNL - Conceptual level interface is important prior to design review in December.