Priority | MD Item | Procedure Link | Machine Time (shifts) | Responsible Party | Needed By | Prerequisites | Notes |
---|---|---|---|---|---|---|---|
3 | Injector setup for 10deg off Schottky zero crossing | 3 | Maybe investigate smaller laser spot | ||||
3 | Linac Ballistic Data | 5 | |||||
3 | Individual mechanical<>magnetic offsets in L2 | ||||||
1 | S20 BBA | 2 | Yocky | ||||
2-4 | Notch Collimator recommissioning | 1+2 | Current energy spread may not be compatible with clean cuts | ||||
2 | S20 matching studies/emittance in S20 | Sep 8, 2022 | 1 | White | |||
3 | 2nC running/instability investigation | 2 | FJD interested | ||||
TBD | Two-bunch prep/setup | ||||||
4 | BLEN sensitivities | BLEN Sensitivities MD | Alsberg | ||||
2 | Investigate orbit dependent matching into L2 | BBA | FJD notes similar issue in LCLS–likely eta from BC1 | ||||
1 | Complete ORM | Sep 15, 2022 | Loney | ||||
2 | Tuning IP with smaller beta* | Yocky | |||||
TBD | Pencil beam config | ||||||
3 | Learning data for MDL FF / Track hardware issues | Sep 29, 2022 | Alsberg | ||||
4 | RF kicks | ||||||
1 | Linac BBA | BBA Shift Plan | Loney | Need assessment of where we're at | |||
3 | Toroid ringing investigation | Sep 1, 2022 | Alsberg | ||||
4 | Injector RF Standby triggering | ||||||
2 | Automated Steering development | White/all | |||||
2 | L1 orbit stability study | Parker | |||||
2 | RF stability (jitter, jumps, and djrift) | Sep 15, 2022 | Ripman | ||||
2 | DC magnet stability | Parker | |||||
2 | TCAV0 study (sigz v. Sch. phase, etc.) | Parker | |||||
1 | Linac wakefield bump tuning exploration |