General overview
- Run planning: https://docs.google.com/spreadsheets/d/1y8mnxkCVaOs73ekeLUS-UJZJWMsA7eOH/edit?usp=sharing&ouid=103601260766104549989&rtpof=true&sd=true
- Shift reports: http://ad-ops.slac.stanford.edu/facet-shift-report/
Procedures
- FACET beam vector procedure: https://docs.google.com/document/d/1S94E_sG0lsHjCt70gnzeCo6ReKtVgDCiAdlnnkhN10c/edit
- E-320 No-beam Laser Alignment, Alignment target test (attenuated laser) + repeat of high-power beam dump test (full power laser)
https://docs.google.com/document/d/1sBxmYC8zqqaLUJwpkVYCQ3L-C04nBamIJh6C8BZw_Dk/edit?usp=sharing - E-320 SFQED Assembly Commissioning Shift Plan with laser and e-beam
https://docs.google.com/document/d/1TR6Pyk6s_p5_ibCRqRT1_EGhiL0NP0YRe1T6-oPBaRU/edit?usp=sharing - E300/E320 Check list for full power laser test run to the tunnel V2
https://docs.google.com/document/d/1oKyrm289sxPo8PpCDxToUMMmVZiXFL2tPrE2z2-gPrs/edit?usp=sharing
Important milestones
- 2022 May 2: high-power laser beam dump test
History
- May 11, 2022: Foil commissioning shift (https://docs.google.com/document/d/1IOm-yBNrRM5SL5Kz1PSp9qz6MbsmGO__9mI3ItaUfjk/edit)
May 10, 2022: EOS commissioning shift ()
- May 8, 2022: E308 commissioning shift take 2 (https://docs.google.com/document/d/1H7Gcpjfe_1ZViNZjyoEpxbZLZsZ8MFdOxn1q42Rs2iA/edit#heading=h.2vex6f5ob2xd)
- May 7, 2022: spectrometer commissioning shift (https://docs.google.com/document/d/1A3RfoVOopjoxTbNDSk-5PemZUkAwEaoEGOnekJzoszs/edit#)