The following supply list and step by step guide will vary based on individual BIO specs and serves only as a general guideline.

General Supply List

  • Drilling tools
  • Anchors
  • Anchor expoxy (check BIO but standard is hilti epoxy)
  • aluminum siding
  • aluminum tape
  • gray caulk (to match flooring)
  • set screws (adjust height of plate)
  • Grout (epoxy100 EPOXY GROUT 22# KIT 493014 standard or cement pending on (question))
  • painters tape/newspaper (to cover up plate from grout)
  • nylon screws (the size of anchors to insert into mounts to prevent grout from getting in)

Step-by-step guide

  1. BIO Approval
  2. Drill anchors
  3. Epoxy anchors (typically BIO present) & let cure for time needed
  4. Move base plate into place & insert set screws
  5. Call alignment to set position of plate
  6. Fabricate aluminum side plates
  7. Caulk to sides of base plate & aluminum tape corners
  8. Cover top of base plate to prevent grout spillage
  9. Mix grout
  10. Pour grout & let cure for time needed
  11. Torque down anchors (typically BIO present)
  12. Done



Individuals with the most experienced and can be referenced for knowledge are abc.